{"title":"金海大桥设计与施工","authors":"LiNa Ping, Deng Yong Feng, Xiaone Wei","doi":"10.1680/jbren.21.00091","DOIUrl":null,"url":null,"abstract":"The Jinhai main bridge is designed as a cable-stayed bridge with a single deck carrying a double rail track in the middle and 3 lanes of highway on each side. The structural design combines a rigid frame with continuous spans, effectively improving the overall structural rigidity to meet the requirements for railway traffic, and meanwhile minimizing the temperature effects from a long continuous structure. The deck girder adopts a steel box with large cantilever flanges, which is cost-effective. The steel pylons are designed with four legs which locate on top of the deck instead of on pile cap, to minimize the size of the pile foundation. To improve the construction efficiency, the main girder and pylons are pre-fabricated into large-scale components and erected using heavy equipment.","PeriodicalId":44437,"journal":{"name":"Proceedings of the Institution of Civil Engineers-Bridge Engineering","volume":"11 1","pages":""},"PeriodicalIF":1.5000,"publicationDate":"2022-05-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Design and Construction of Jinhai Bridge\",\"authors\":\"LiNa Ping, Deng Yong Feng, Xiaone Wei\",\"doi\":\"10.1680/jbren.21.00091\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The Jinhai main bridge is designed as a cable-stayed bridge with a single deck carrying a double rail track in the middle and 3 lanes of highway on each side. The structural design combines a rigid frame with continuous spans, effectively improving the overall structural rigidity to meet the requirements for railway traffic, and meanwhile minimizing the temperature effects from a long continuous structure. The deck girder adopts a steel box with large cantilever flanges, which is cost-effective. The steel pylons are designed with four legs which locate on top of the deck instead of on pile cap, to minimize the size of the pile foundation. To improve the construction efficiency, the main girder and pylons are pre-fabricated into large-scale components and erected using heavy equipment.\",\"PeriodicalId\":44437,\"journal\":{\"name\":\"Proceedings of the Institution of Civil Engineers-Bridge Engineering\",\"volume\":\"11 1\",\"pages\":\"\"},\"PeriodicalIF\":1.5000,\"publicationDate\":\"2022-05-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the Institution of Civil Engineers-Bridge Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1680/jbren.21.00091\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"ENGINEERING, CIVIL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the Institution of Civil Engineers-Bridge Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1680/jbren.21.00091","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
引用次数: 0

摘要

金海主桥设计为单层斜拉桥,中间为双轨轨道,两侧为3车道公路。结构设计将刚架与连续跨相结合,有效地提高了整体结构刚度,满足了铁路交通的要求,同时最大限度地减少了长连续结构的温度影响。桥面梁采用大悬臂法兰钢箱,性价比高。钢塔设计有四个腿,位于甲板顶部,而不是在桩帽上,以尽量减少桩基础的尺寸。为了提高施工效率,主梁和塔架预制成大型构件,并使用重型设备进行架设。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Design and Construction of Jinhai Bridge
The Jinhai main bridge is designed as a cable-stayed bridge with a single deck carrying a double rail track in the middle and 3 lanes of highway on each side. The structural design combines a rigid frame with continuous spans, effectively improving the overall structural rigidity to meet the requirements for railway traffic, and meanwhile minimizing the temperature effects from a long continuous structure. The deck girder adopts a steel box with large cantilever flanges, which is cost-effective. The steel pylons are designed with four legs which locate on top of the deck instead of on pile cap, to minimize the size of the pile foundation. To improve the construction efficiency, the main girder and pylons are pre-fabricated into large-scale components and erected using heavy equipment.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
3.00
自引率
10.00%
发文量
48
期刊最新文献
Hybrid machine learning model for prediction of vertical deflection of composite bridges A control chart to evaluate the control effect of a bridge under active control Design of stone masonry bridges in European treatises: Part 1 – The geometrical configuration Extreme fjord-crossings development in the E39 coastal highway route project – a review The replacement of the Kosciuszko Bridge
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1