最大限度地提高分布式双机流程车间的早期总工作量

A. Dolgui, M. Kovalyov, B. Lin
{"title":"最大限度地提高分布式双机流程车间的早期总工作量","authors":"A. Dolgui, M. Kovalyov, B. Lin","doi":"10.1002/nav.22076","DOIUrl":null,"url":null,"abstract":"The problem of maximizing total early work in a two‐machine flow‐shop, in which n jobs are to be scheduled subject to a common due date d, has been recently studied in the scheduling literature. An O(n2d4) time dynamic programming algorithm was presented first for the weighted case, and then for the unweighted case another O(n2d2) running time dynamic programming algorithm was proposed and converted into an On4ε2$$ O\\left(\\frac{n^4}{\\varepsilon^2}\\right) $$ time fully polynomial time approximation scheme (FPTAS). By establishing new problem properties, we present an O(nd2) time dynamic programming algorithm and an On3ε2$$ O\\left(\\frac{n^3}{\\varepsilon^2}\\right) $$ time FPTAS for the unweighted problem. We generalize the problem to a distributed setting of m parallel two‐machine flow‐shops, develop an O(nd3m) time dynamic programming algorithm, an On3m+1ε3m$$ O\\left(\\frac{n^{3m+1}}{\\varepsilon^{3m}}\\right) $$ time FPTAS, and three integer linear programming (ILP) formulations for it. Computational experiments are conducted to appraise the proposed ILP models.","PeriodicalId":19120,"journal":{"name":"Naval Research Logistics (NRL)","volume":"26 1","pages":"1124 - 1137"},"PeriodicalIF":0.0000,"publicationDate":"2022-08-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Maximizing total early work in a distributed two‐machine flow‐shop\",\"authors\":\"A. Dolgui, M. Kovalyov, B. Lin\",\"doi\":\"10.1002/nav.22076\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The problem of maximizing total early work in a two‐machine flow‐shop, in which n jobs are to be scheduled subject to a common due date d, has been recently studied in the scheduling literature. An O(n2d4) time dynamic programming algorithm was presented first for the weighted case, and then for the unweighted case another O(n2d2) running time dynamic programming algorithm was proposed and converted into an On4ε2$$ O\\\\left(\\\\frac{n^4}{\\\\varepsilon^2}\\\\right) $$ time fully polynomial time approximation scheme (FPTAS). By establishing new problem properties, we present an O(nd2) time dynamic programming algorithm and an On3ε2$$ O\\\\left(\\\\frac{n^3}{\\\\varepsilon^2}\\\\right) $$ time FPTAS for the unweighted problem. We generalize the problem to a distributed setting of m parallel two‐machine flow‐shops, develop an O(nd3m) time dynamic programming algorithm, an On3m+1ε3m$$ O\\\\left(\\\\frac{n^{3m+1}}{\\\\varepsilon^{3m}}\\\\right) $$ time FPTAS, and three integer linear programming (ILP) formulations for it. Computational experiments are conducted to appraise the proposed ILP models.\",\"PeriodicalId\":19120,\"journal\":{\"name\":\"Naval Research Logistics (NRL)\",\"volume\":\"26 1\",\"pages\":\"1124 - 1137\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-08-23\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Naval Research Logistics (NRL)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1002/nav.22076\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Naval Research Logistics (NRL)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1002/nav.22076","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

最近在调度文献中研究了双机流程车间中最大限度地提高总提前工作的问题,其中n个作业被调度到一个共同的截止日期d。首先对加权情况提出了一种O(n2d2)时间动态规划算法,然后对未加权情况提出了另一种O(n2d2)时间动态规划算法,并将其转化为On4ε2 $$ O\left(\frac{n^4}{\varepsilon^2}\right) $$时间全多项式时间逼近格式(FPTAS)。通过建立新的问题性质,我们提出了一个O(nd2)时间动态规划算法和一个On3ε2 $$ O\left(\frac{n^3}{\varepsilon^2}\right) $$时间FPTAS。我们将问题推广到m个并行双机流车间的分布式设置,开发了一个O(nd3m)时间动态规划算法,一个On3m+1ε3m $$ O\left(\frac{n^{3m+1}}{\varepsilon^{3m}}\right) $$时间FPTAS,以及三个整数线性规划(ILP)公式。计算实验对所提出的ILP模型进行了评价。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Maximizing total early work in a distributed two‐machine flow‐shop
The problem of maximizing total early work in a two‐machine flow‐shop, in which n jobs are to be scheduled subject to a common due date d, has been recently studied in the scheduling literature. An O(n2d4) time dynamic programming algorithm was presented first for the weighted case, and then for the unweighted case another O(n2d2) running time dynamic programming algorithm was proposed and converted into an On4ε2$$ O\left(\frac{n^4}{\varepsilon^2}\right) $$ time fully polynomial time approximation scheme (FPTAS). By establishing new problem properties, we present an O(nd2) time dynamic programming algorithm and an On3ε2$$ O\left(\frac{n^3}{\varepsilon^2}\right) $$ time FPTAS for the unweighted problem. We generalize the problem to a distributed setting of m parallel two‐machine flow‐shops, develop an O(nd3m) time dynamic programming algorithm, an On3m+1ε3m$$ O\left(\frac{n^{3m+1}}{\varepsilon^{3m}}\right) $$ time FPTAS, and three integer linear programming (ILP) formulations for it. Computational experiments are conducted to appraise the proposed ILP models.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Assigning parcel destinations to drop‐off points in a congested robotic sorting system An optimization‐based Monte Carlo method for estimating the two‐terminal survival signature of networks with two component classes A two‐stage adaptive robust model for designing a reliable blood supply chain network with disruption considerations in disaster situations Firm decisions and government subsidies in a supply chain with consumer surplus consideration Optimal emission regulation under market uncertainty
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1