{"title":"利用DFA对铸铁进行重新设计,以降低装配成本和时间","authors":"R. Ginting, R. Silalahi","doi":"10.5604/01.3001.0053.5954","DOIUrl":null,"url":null,"abstract":"Nowadays, product development is very important to remain competitive in the market, one of which is to reduce the assembly of time and cost design. This article discusses the study of iron products on the market. Based on the problems found in the SMEs of Electronic Services, this iron has many components and complex designs that take time-consuming to assemble. Therefore, the purpose of this article is to redesign the ironing.Improvements to the design of iron products are based on the problems present in this product. This problem is obtained by distributing questionnaires to Electronic Services SMEs. The improvements are carried out using the Design for Assembly (DFA) method to evaluate the design with ease of assembly processes.This paper attempt to improve the design of ironing products according to the problems obtained from the initial questionnaire, which is to reduce the assembly time and costs using DFA.The result of these improvements is a reduction in the amount of assembly time and costs and an increase in efficiency. The actual design assembly time is 358.16 to 269.70 seconds on the proposed design. The actual design assembly cost budget is 956.81,- rupiahs, reduced to 720.50, in the proposed design. Then the actual design efficiency of 21.77% increased to 24.74%.Iron design improvements are based on problems and complaints received from the electronic services SMEs, then analysed using the DFA method. Therefore, the improvements in the design of the ironing product are present in two components, that is the back cover and the handle.","PeriodicalId":14825,"journal":{"name":"Journal of Achievements in Materials and Manufacturing Engineering","volume":"16 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Redesign of iron for assembly cost and time reduction using DFA\",\"authors\":\"R. Ginting, R. Silalahi\",\"doi\":\"10.5604/01.3001.0053.5954\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Nowadays, product development is very important to remain competitive in the market, one of which is to reduce the assembly of time and cost design. This article discusses the study of iron products on the market. Based on the problems found in the SMEs of Electronic Services, this iron has many components and complex designs that take time-consuming to assemble. Therefore, the purpose of this article is to redesign the ironing.Improvements to the design of iron products are based on the problems present in this product. This problem is obtained by distributing questionnaires to Electronic Services SMEs. The improvements are carried out using the Design for Assembly (DFA) method to evaluate the design with ease of assembly processes.This paper attempt to improve the design of ironing products according to the problems obtained from the initial questionnaire, which is to reduce the assembly time and costs using DFA.The result of these improvements is a reduction in the amount of assembly time and costs and an increase in efficiency. The actual design assembly time is 358.16 to 269.70 seconds on the proposed design. The actual design assembly cost budget is 956.81,- rupiahs, reduced to 720.50, in the proposed design. Then the actual design efficiency of 21.77% increased to 24.74%.Iron design improvements are based on problems and complaints received from the electronic services SMEs, then analysed using the DFA method. Therefore, the improvements in the design of the ironing product are present in two components, that is the back cover and the handle.\",\"PeriodicalId\":14825,\"journal\":{\"name\":\"Journal of Achievements in Materials and Manufacturing Engineering\",\"volume\":\"16 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-03-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Achievements in Materials and Manufacturing Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.5604/01.3001.0053.5954\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"Engineering\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Achievements in Materials and Manufacturing Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5604/01.3001.0053.5954","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Engineering","Score":null,"Total":0}
Redesign of iron for assembly cost and time reduction using DFA
Nowadays, product development is very important to remain competitive in the market, one of which is to reduce the assembly of time and cost design. This article discusses the study of iron products on the market. Based on the problems found in the SMEs of Electronic Services, this iron has many components and complex designs that take time-consuming to assemble. Therefore, the purpose of this article is to redesign the ironing.Improvements to the design of iron products are based on the problems present in this product. This problem is obtained by distributing questionnaires to Electronic Services SMEs. The improvements are carried out using the Design for Assembly (DFA) method to evaluate the design with ease of assembly processes.This paper attempt to improve the design of ironing products according to the problems obtained from the initial questionnaire, which is to reduce the assembly time and costs using DFA.The result of these improvements is a reduction in the amount of assembly time and costs and an increase in efficiency. The actual design assembly time is 358.16 to 269.70 seconds on the proposed design. The actual design assembly cost budget is 956.81,- rupiahs, reduced to 720.50, in the proposed design. Then the actual design efficiency of 21.77% increased to 24.74%.Iron design improvements are based on problems and complaints received from the electronic services SMEs, then analysed using the DFA method. Therefore, the improvements in the design of the ironing product are present in two components, that is the back cover and the handle.
期刊介绍:
The Journal of Achievements in Materials and Manufacturing Engineering has been published by the Association for Computational Materials Science and Surface Engineering in collaboration with the World Academy of Materials and Manufacturing Engineering WAMME and the Section Metallic Materials of the Committee of Materials Science of the Polish Academy of Sciences as a monthly. It has 12 points which was received during the evaluation by the Ministry of Science and Higher Education journals and ICV 2017:100 on the ICI Journals Master list announced by the Index Copernicus. It is a continuation of "Proceedings on Achievements in Mechanical and Materials Engineering" published in 1992-2005. Scope: Materials[...] Properties[...] Methodology of Research[...] Analysis and Modelling[...] Manufacturing and Processingv Biomedical and Dental Engineering and Materials[...] Cleaner Production[...] Industrial Mangement and Organisation [...] Education and Research Trends[...]