{"title":"快速可控硅作为火花间隙替换的试验","authors":"M. Jung, W. Mayerhofer, M. Edele, O. Gstir, T. Schweizer, E. Zeyfang, E. Ramezani","doi":"10.1109/PPC.1995.596806","DOIUrl":null,"url":null,"abstract":"To replace the spark gaps in the PFNs of our pulsed high power CO/sub 2/ laser first investigations on fast SCRs have been made. We report our tests on stacked high current thyristors (HCT) as a closing switch at an 8 /spl mu/F capacitor bank with various resistor loads. The charged voltage per stack unit was up to 3.6 kV. At a peak current of 9 kA, we reached a maximum di/dt of 8 kA//spl mu/s. First tests on repetitive operations have been done. The results show the possibility to replace the spark gaps of our system by HCTs.","PeriodicalId":11163,"journal":{"name":"Digest of Technical Papers. Tenth IEEE International Pulsed Power Conference","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"1995-07-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":"{\"title\":\"Test of fast SCRs as spark gap replacement\",\"authors\":\"M. Jung, W. Mayerhofer, M. Edele, O. Gstir, T. Schweizer, E. Zeyfang, E. Ramezani\",\"doi\":\"10.1109/PPC.1995.596806\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"To replace the spark gaps in the PFNs of our pulsed high power CO/sub 2/ laser first investigations on fast SCRs have been made. We report our tests on stacked high current thyristors (HCT) as a closing switch at an 8 /spl mu/F capacitor bank with various resistor loads. The charged voltage per stack unit was up to 3.6 kV. At a peak current of 9 kA, we reached a maximum di/dt of 8 kA//spl mu/s. First tests on repetitive operations have been done. The results show the possibility to replace the spark gaps of our system by HCTs.\",\"PeriodicalId\":11163,\"journal\":{\"name\":\"Digest of Technical Papers. Tenth IEEE International Pulsed Power Conference\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1995-07-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"6\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Digest of Technical Papers. Tenth IEEE International Pulsed Power Conference\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PPC.1995.596806\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Digest of Technical Papers. Tenth IEEE International Pulsed Power Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PPC.1995.596806","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 6

摘要

为了取代脉冲大功率CO/sub / 2激光器PFNs中的火花隙,我们首次对快速晶闸管进行了研究。我们报告了我们对堆叠大电流晶闸管(HCT)作为8 /spl mu/F电容器组与各种电阻负载的闭合开关的测试。每个堆叠单元的充电电压高达3.6 kV。在峰值电流为9 kA时,最大di/dt为8 kA//spl mu/s。重复操作的第一次测试已经完成。结果表明,用hct代替系统的火花间隙是可行的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Test of fast SCRs as spark gap replacement
To replace the spark gaps in the PFNs of our pulsed high power CO/sub 2/ laser first investigations on fast SCRs have been made. We report our tests on stacked high current thyristors (HCT) as a closing switch at an 8 /spl mu/F capacitor bank with various resistor loads. The charged voltage per stack unit was up to 3.6 kV. At a peak current of 9 kA, we reached a maximum di/dt of 8 kA//spl mu/s. First tests on repetitive operations have been done. The results show the possibility to replace the spark gaps of our system by HCTs.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Modeling of DM1 POS and load performance Investigations of compact high-current accelerators RADAN-303 synchronization with nanosecond accuracy Experimental results from a coaxial virtual cathode oscillator The 67 MJ, 50 kV capacitor bank for the high-power iodine laser of the facility ISKRA-5: description and experience An investigation of trigatron breakdown by two different mechanisms
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1