优化迁移到移动块信号的部署策略-基于minlp的车载列车完整性监测技术方法

Jakob Geischberger , Alessa Isberner , Norman Weik
{"title":"优化迁移到移动块信号的部署策略-基于minlp的车载列车完整性监测技术方法","authors":"Jakob Geischberger ,&nbsp;Alessa Isberner ,&nbsp;Norman Weik","doi":"10.1016/j.jrtpm.2023.100417","DOIUrl":null,"url":null,"abstract":"<div><p>Increasing demand on heavily-used rail corridors in line with the modernization of the signaling architecture are key drivers for migrating to modern, moving-block based train control in the European railway network. In order to maximally profit from the increase of reliability and reduction of costs associated with shifting towards full ETCS Level 3 from a network management perspective, additional requirements on the fleet management level arise. Amongst other things, if track vacancy detection equipment is to be eliminated, all trains operating on these lines need to be equipped with on-board train integrity (OTI) monitoring solutions. In order to facilitate the planning of the OTI network migration processes, a MINLP-model is proposed which allows economic optimization of OTI migration in view of fleet allocation and the removal of trackside equipment for train integrity verification within the network. The model is tested in a case-study based on a generic network abstracted from the Austrian mainline network and found to significantly enhance planning compared to heuristic migration strategies.</p></div>","PeriodicalId":51821,"journal":{"name":"Journal of Rail Transport Planning & Management","volume":"28 ","pages":"Article 100417"},"PeriodicalIF":2.6000,"publicationDate":"2023-10-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://www.sciencedirect.com/science/article/pii/S2210970623000495/pdfft?md5=2a4843d4249f6eca401a9c3221acbea1&pid=1-s2.0-S2210970623000495-main.pdf","citationCount":"0","resultStr":"{\"title\":\"Optimizing rollout strategies for migration to moving block signaling – A MINLP-based approach for on-board train integrity monitoring technology\",\"authors\":\"Jakob Geischberger ,&nbsp;Alessa Isberner ,&nbsp;Norman Weik\",\"doi\":\"10.1016/j.jrtpm.2023.100417\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><p>Increasing demand on heavily-used rail corridors in line with the modernization of the signaling architecture are key drivers for migrating to modern, moving-block based train control in the European railway network. In order to maximally profit from the increase of reliability and reduction of costs associated with shifting towards full ETCS Level 3 from a network management perspective, additional requirements on the fleet management level arise. Amongst other things, if track vacancy detection equipment is to be eliminated, all trains operating on these lines need to be equipped with on-board train integrity (OTI) monitoring solutions. In order to facilitate the planning of the OTI network migration processes, a MINLP-model is proposed which allows economic optimization of OTI migration in view of fleet allocation and the removal of trackside equipment for train integrity verification within the network. The model is tested in a case-study based on a generic network abstracted from the Austrian mainline network and found to significantly enhance planning compared to heuristic migration strategies.</p></div>\",\"PeriodicalId\":51821,\"journal\":{\"name\":\"Journal of Rail Transport Planning & Management\",\"volume\":\"28 \",\"pages\":\"Article 100417\"},\"PeriodicalIF\":2.6000,\"publicationDate\":\"2023-10-26\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://www.sciencedirect.com/science/article/pii/S2210970623000495/pdfft?md5=2a4843d4249f6eca401a9c3221acbea1&pid=1-s2.0-S2210970623000495-main.pdf\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Rail Transport Planning & Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/S2210970623000495\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"TRANSPORTATION\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Rail Transport Planning & Management","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S2210970623000495","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"TRANSPORTATION","Score":null,"Total":0}
引用次数: 0

摘要

随着信号体系结构的现代化,对频繁使用的铁路走廊的需求不断增加,这是欧洲铁路网向现代化、基于移动块的列车控制迁移的关键驱动因素。从网络管理的角度来看,为了最大限度地从可靠性的提高和成本的降低中获利,同时转向完整的ETCS第3级,对车队管理层提出了额外的要求。除此之外,如果要取消轨道空缺检测设备,那么在这些线路上运行的所有列车都需要配备车载列车完整性(OTI)监控解决方案。为了方便OTI网络迁移过程的规划,提出了一种minlp模型,该模型考虑了车队分配和移除轨侧设备以在网络内验证列车完整性,从而实现了OTI迁移的经济优化。该模型在基于从奥地利干线网络抽象的一般网络的案例研究中进行了测试,发现与启发式迁移策略相比,该模型显着增强了规划。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Optimizing rollout strategies for migration to moving block signaling – A MINLP-based approach for on-board train integrity monitoring technology

Increasing demand on heavily-used rail corridors in line with the modernization of the signaling architecture are key drivers for migrating to modern, moving-block based train control in the European railway network. In order to maximally profit from the increase of reliability and reduction of costs associated with shifting towards full ETCS Level 3 from a network management perspective, additional requirements on the fleet management level arise. Amongst other things, if track vacancy detection equipment is to be eliminated, all trains operating on these lines need to be equipped with on-board train integrity (OTI) monitoring solutions. In order to facilitate the planning of the OTI network migration processes, a MINLP-model is proposed which allows economic optimization of OTI migration in view of fleet allocation and the removal of trackside equipment for train integrity verification within the network. The model is tested in a case-study based on a generic network abstracted from the Austrian mainline network and found to significantly enhance planning compared to heuristic migration strategies.

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
7.10
自引率
8.10%
发文量
41
期刊最新文献
A MILP model to improve the robustness of a railway timetable by retiming and rerouting in a complex bottleneck area A decomposition approach to solve the individual railway crew Re-planning problem A Bi-objective model and a branch-and-price-and-cut solution method for the railroad blocking problem in hazardous material transportation Relationships between service quality and customer satisfaction in rail freight transportation: A structural equation modeling approach The evaluation of competition effect on rail fares using the difference-in-difference method through symmetric and lagged spans
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1