How can flicker level be determined before a customer is connected to the electric grid

X. Yang, J. Gauthier
{"title":"How can flicker level be determined before a customer is connected to the electric grid","authors":"X. Yang, J. Gauthier","doi":"10.1109/PES.2009.5276016","DOIUrl":null,"url":null,"abstract":"Among all electric disturbances, flicker is not the most harmful one resulting in malfunction of grid equipment and customer appliances, because flicker phenomena is evidently visible, all twinkling lamps may lead to often LV customer complaints. For utilities, flicker estimation is one of the necessary tasks in assessment of emission level for the connection of fluctuating installations to electric power systems. Two main grid access contracts have been put into service in France between utilities and customers. These grid connection contracts not only fix power quality commitments for system operators but also set customer disturbance emission limits. The practice of these contracts is to emphasize that a good overall electric power quality can only be achieved by respecting commitments and doing effort from both of grid and customer sides. The system operator is responsible for specifying requirements for the connection of fluctuating installations to the system. Some simplified methods used by utilities have been presented in this article. System operators have to perform pre-connection study before a customer is connected to their grid. In order to comply with flicker commitments and some relevant IEC standards in emission limits for fluctuating installations, adequate methods under scope of IEC rules have been used in estimating customer flicker emission level prior to load connection. For flicker assessment in the sophisticate network and with irregular load changes, the method based on electric circuit simulation including flicker source models and IEC flicker meter emulator is presented. Case studies show this method is very appropriate in pre-connection studies.","PeriodicalId":258632,"journal":{"name":"2009 IEEE Power & Energy Society General Meeting","volume":"22 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2009-07-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2009 IEEE Power & Energy Society General Meeting","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PES.2009.5276016","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 7

Abstract

Among all electric disturbances, flicker is not the most harmful one resulting in malfunction of grid equipment and customer appliances, because flicker phenomena is evidently visible, all twinkling lamps may lead to often LV customer complaints. For utilities, flicker estimation is one of the necessary tasks in assessment of emission level for the connection of fluctuating installations to electric power systems. Two main grid access contracts have been put into service in France between utilities and customers. These grid connection contracts not only fix power quality commitments for system operators but also set customer disturbance emission limits. The practice of these contracts is to emphasize that a good overall electric power quality can only be achieved by respecting commitments and doing effort from both of grid and customer sides. The system operator is responsible for specifying requirements for the connection of fluctuating installations to the system. Some simplified methods used by utilities have been presented in this article. System operators have to perform pre-connection study before a customer is connected to their grid. In order to comply with flicker commitments and some relevant IEC standards in emission limits for fluctuating installations, adequate methods under scope of IEC rules have been used in estimating customer flicker emission level prior to load connection. For flicker assessment in the sophisticate network and with irregular load changes, the method based on electric circuit simulation including flicker source models and IEC flicker meter emulator is presented. Case studies show this method is very appropriate in pre-connection studies.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
在客户连接到电网之前,如何确定闪烁水平
在所有的电力干扰中,闪烁并不是造成电网设备和用户电器故障的最有害的一种,因为闪烁现象明显可见,所有闪烁的灯都可能导致经常低压客户投诉。对于电力公司来说,闪烁估计是评估波动装置与电力系统连接的排放水平的必要任务之一。在法国,两份主要的电网接入合同已经在公用事业公司和客户之间投入使用。这些并网合同不仅为系统运营商确定了电能质量承诺,而且还设定了客户干扰排放限制。这些合同的实践是强调只有电网和客户双方都尊重承诺,共同努力,才能实现良好的整体电力质量。系统操作员负责规定波动装置与系统的连接要求。本文介绍了实用程序使用的一些简化方法。系统操作员必须在客户连接到他们的电网之前进行预连接研究。为了遵守对波动装置的闪变排放限值的承诺和一些相关的IEC标准,在IEC规则范围内使用了适当的方法来估计负载连接之前的客户闪变排放水平。针对复杂电网中负荷变化不规律的闪变评估问题,提出了基于闪变源模型和IEC闪变计仿真的电路仿真方法。案例研究表明,该方法非常适用于连接前研究。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Substation fault analysis requirements On field experience results related to high-impedance faults in power distribution system Reactive power compensation using Z-source based photovoltaic system How can flicker level be determined before a customer is connected to the electric grid Transmission expansion and pricing in Colombia: An appraisal of current practices
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1