Design optimization model for the United Arab Emirates power sector under uncertainty

Alberto Betancourt-Torcat, A. Almansoori
{"title":"Design optimization model for the United Arab Emirates power sector under uncertainty","authors":"Alberto Betancourt-Torcat, A. Almansoori","doi":"10.1109/SEGE.2015.7324584","DOIUrl":null,"url":null,"abstract":"A mixed integer linear programming model for the optimal design of the United Arab Emirates power infrastructure under uncertainty is presented. The optimization objective is the minimization of the power generation costs in the UAE under techno-economic and environmental constraints. Uncertainty is considered in the carbon tax price and social benefits associated with the avoidance of air emissions. The optimization problem was formulated in the General Algebraic Modeling System (GAMS®). The novelty of the present work consists of determining the most suitable combination of power generation plants under uncertainty. This work also considers the introduction of alternative energy sources such as nuclear and renewables into the country's power fleet. Two case studies are solved to demonstrate the usefulness of the devised approach.","PeriodicalId":409488,"journal":{"name":"2015 IEEE International Conference on Smart Energy Grid Engineering (SEGE)","volume":"13 25","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-11-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2015 IEEE International Conference on Smart Energy Grid Engineering (SEGE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SEGE.2015.7324584","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

A mixed integer linear programming model for the optimal design of the United Arab Emirates power infrastructure under uncertainty is presented. The optimization objective is the minimization of the power generation costs in the UAE under techno-economic and environmental constraints. Uncertainty is considered in the carbon tax price and social benefits associated with the avoidance of air emissions. The optimization problem was formulated in the General Algebraic Modeling System (GAMS®). The novelty of the present work consists of determining the most suitable combination of power generation plants under uncertainty. This work also considers the introduction of alternative energy sources such as nuclear and renewables into the country's power fleet. Two case studies are solved to demonstrate the usefulness of the devised approach.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
不确定条件下阿联酋电力部门设计优化模型
提出了一种用于不确定条件下阿联酋电力基础设施优化设计的混合整数线性规划模型。优化目标是在技术经济和环境约束下使阿联酋的发电成本最小化。不确定性被考虑在碳税价格和与避免空气排放相关的社会效益中。优化问题是在通用代数建模系统(GAMS®)中制定的。本文工作的新颖之处在于在不确定条件下确定最合适的发电机组组合。这项工作还考虑将替代能源(如核能和可再生能源)引入该国的电力系统。解决了两个案例研究,以证明所设计的方法的有效性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Design optimization model for the United Arab Emirates power sector under uncertainty Offering strategy of a Plug-in Electric Vehicle parking lot in renewable-based distribution networks Optimal planned scheduling of distributed generators in microgrids Soft computing approach for solar radiation prediction over Abu Dhabi, UAE: A comparative analysis Operation reliability analysis of single busbar power distribution network using statistics
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1