DESIGN UPPER STRUCTURE OF THE RIVER BAKI BRIDGE USES A STEEL FRAME

Tasliyatul Fuadiyah, D. Enda, I. Puluhulawa
{"title":"DESIGN UPPER STRUCTURE OF THE RIVER BAKI BRIDGE USES A STEEL FRAME","authors":"Tasliyatul Fuadiyah, D. Enda, I. Puluhulawa","doi":"10.33603/jgst.v2i3.2146","DOIUrl":null,"url":null,"abstract":"In general, the bridge type is a reinforced concrete bridge, composite and steel frame. The Baki River Bridge was originally a 40 m long Wood type bridge connecting the village of Mengkopot Tanjung Pisang because the condition of the Baki river bridge has been damaged especially on bridge floors and girders due to age, so it is planned to re-use the steel frame bridge structure. By using the steel bridge structure, it is expected that later it can be a comparison for the future bridge planning. In this study, the structure of the planned bridge consists of bridge slabs, sidewalk slabs, backrest pipes, longitudinal and transverse girders, steel frames, wind ties, and joints. By following the SNI T-02-2005 bridge loading standard, SNI T-03-2005 for planning steel bridge structures and SNI T-12-2004 for planning concrete structures on bridges. From the planning results obtained thickness 200 mm Bridge Slab and thick sidewalk slab 250 mm with a longitudinal girder profile used WF 600.200.11.17 mm steel with a distance between girders 1.75 m. Transverse girders of steel profiles WF 700,300.13.24 are used with the distance between girders 5 m. Used Steel profiles WF 400,400.13.21 as Main Frame and Steel WF profile 150.150.7.10 as profiles for wind ties.","PeriodicalId":419103,"journal":{"name":"Journal of Green Science and Technology","volume":"35 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-04-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Green Science and Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33603/jgst.v2i3.2146","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

In general, the bridge type is a reinforced concrete bridge, composite and steel frame. The Baki River Bridge was originally a 40 m long Wood type bridge connecting the village of Mengkopot Tanjung Pisang because the condition of the Baki river bridge has been damaged especially on bridge floors and girders due to age, so it is planned to re-use the steel frame bridge structure. By using the steel bridge structure, it is expected that later it can be a comparison for the future bridge planning. In this study, the structure of the planned bridge consists of bridge slabs, sidewalk slabs, backrest pipes, longitudinal and transverse girders, steel frames, wind ties, and joints. By following the SNI T-02-2005 bridge loading standard, SNI T-03-2005 for planning steel bridge structures and SNI T-12-2004 for planning concrete structures on bridges. From the planning results obtained thickness 200 mm Bridge Slab and thick sidewalk slab 250 mm with a longitudinal girder profile used WF 600.200.11.17 mm steel with a distance between girders 1.75 m. Transverse girders of steel profiles WF 700,300.13.24 are used with the distance between girders 5 m. Used Steel profiles WF 400,400.13.21 as Main Frame and Steel WF profile 150.150.7.10 as profiles for wind ties.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
巴基河大桥上部结构设计采用钢框架
一般来说,桥梁类型是钢筋混凝土桥、组合式和钢框架桥。巴基河大桥原本是一座40米长的木桥,连接Mengkopot Tanjung Pisang村,因为巴基河大桥的状况已经受损,特别是桥面和大梁,因此计划重新使用钢框架桥梁结构。通过采用钢桥结构,期望以后可以为今后的桥梁规划提供参考。在本研究中,规划桥梁的结构由桥板、人行道板、靠背管、纵、横梁、钢框架、风系、接缝组成。参照SNI T-02-2005桥梁荷载标准、SNI T-03-2005钢桥结构规划标准和SNI T-12-2004桥梁混凝土结构规划标准。从规划结果中得到厚度为200 mm的桥板和厚为250 mm的人行道板,纵梁剖面采用WF 600.200.11.17 mm钢,梁与梁之间的距离为1.75 m。横梁采用wf700,300.13.24型钢,梁间距离为5m。主框架采用WF 400,400.13.21钢型材,风扎采用WF 150.150.7.10钢型材。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
COST AND TIME ANALYSIS OF DRAINAGE WORKS USING CONVENTIONAL RIVERSTONE METHOD AND PRECAST U-DITCH METHOD CORRELATION ROAD GEOMETRIC ON ROAD DAMAGE CAR PARKING NEEDS ANALYSIS AT CAMPUS A, JAKARTA STATE UNIVERSITY IN THE CONSTRUCTION PERIOD FACTORS CAUSING TIME DELAYS COMPLETION OF CONSTRUCTION PROJECTS(Case Study on Facilities Building Construction ProjectSports Stage 5 Construction of the East Stand) EFFECTIVENESS OF ABSORPTION WELLS USING THE SUNJOTO METHOD TO CONTROL FLOODING IN THE VILLAGE OF NGRASEH BOJONEGORO
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1