CAR PARKING NEEDS ANALYSIS AT CAMPUS A, JAKARTA STATE UNIVERSITY IN THE CONSTRUCTION PERIOD

Intan Puspa Wangi, Lenggogeni Lenggogeni, Winoto Hadi
{"title":"CAR PARKING NEEDS ANALYSIS AT CAMPUS A, JAKARTA STATE UNIVERSITY IN THE CONSTRUCTION PERIOD","authors":"Intan Puspa Wangi, Lenggogeni Lenggogeni, Winoto Hadi","doi":"10.33603/jgst.v8i1.123","DOIUrl":null,"url":null,"abstract":"Parking is the main supporting facility in the campus environment. Jakarta State University (UNJ) is one of the state universities in the DKI Jakarta province. The increase in the number of UNJ students every year certainly causes an increase in the need for parking, especially on Campus A UNJ as the main campus. Coupled with a construction project in Campus A UNJ, the parking area, especially car parking, is getting narrower. Based on these problems, it is necessary to research parking arrangements at Campus A UNJ.\nThis study aims to determine the need for parking and arrange the car parking area for Campus A UNJ according to the demand for car parking space that existed during the construction period. The parking space arrangement for Campus A UNJ considers UNJ's policy as the manager in allocating parking spaces in the future. Primary data was obtained by conducting a field survey using the number plate survey method and PSU calculation survey while secondary data was obtained from UNJ parking inventory data. Primary data were obtained by conducting field surveys on 29 May-31 May and 8-9 June.\nThe results showed that the value of the need for car parking in 2023 was 367 PSU cars, while the number of parking lots available at Campus A UNJ was 389 PSU. The peak day occurs on Tuesday 30 May 2023 and the peak hour for parking accumulation occurs at 13.00-14.00 WIB. With a parking index close to 100%, this can make it difficult for drivers to find an empty parking space, especially considering the pattern of car parking in the UNJ campus A parking area rotates in one direction so that the opportunity to find an empty parking space during peak parking hours only has a one-time or one-time chance. parking spaces at peak parking hours only have a one-time chance or the driver must first exit the parking lot and then enter again to find an empty parking space. The arrangement of car parking modeling will also be presented in this article. It is hoped that the results of this early-stage research can provide an overview and recommendations on parking management methods at Campus A UNJ.","PeriodicalId":419103,"journal":{"name":"Journal of Green Science and Technology","volume":"58 3","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-03-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Green Science and Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33603/jgst.v8i1.123","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Parking is the main supporting facility in the campus environment. Jakarta State University (UNJ) is one of the state universities in the DKI Jakarta province. The increase in the number of UNJ students every year certainly causes an increase in the need for parking, especially on Campus A UNJ as the main campus. Coupled with a construction project in Campus A UNJ, the parking area, especially car parking, is getting narrower. Based on these problems, it is necessary to research parking arrangements at Campus A UNJ. This study aims to determine the need for parking and arrange the car parking area for Campus A UNJ according to the demand for car parking space that existed during the construction period. The parking space arrangement for Campus A UNJ considers UNJ's policy as the manager in allocating parking spaces in the future. Primary data was obtained by conducting a field survey using the number plate survey method and PSU calculation survey while secondary data was obtained from UNJ parking inventory data. Primary data were obtained by conducting field surveys on 29 May-31 May and 8-9 June. The results showed that the value of the need for car parking in 2023 was 367 PSU cars, while the number of parking lots available at Campus A UNJ was 389 PSU. The peak day occurs on Tuesday 30 May 2023 and the peak hour for parking accumulation occurs at 13.00-14.00 WIB. With a parking index close to 100%, this can make it difficult for drivers to find an empty parking space, especially considering the pattern of car parking in the UNJ campus A parking area rotates in one direction so that the opportunity to find an empty parking space during peak parking hours only has a one-time or one-time chance. parking spaces at peak parking hours only have a one-time chance or the driver must first exit the parking lot and then enter again to find an empty parking space. The arrangement of car parking modeling will also be presented in this article. It is hoped that the results of this early-stage research can provide an overview and recommendations on parking management methods at Campus A UNJ.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
雅加达国立大学 A 校区建设期停车场需求分析
停车场是校园环境的主要配套设施。雅加达国立大学(UNJ)是雅加达省的一所国立大学。随着雅加达国立大学学生人数的逐年增加,对停车场的需求也随之增加,尤其是作为主校区的 A 校区。再加上 A 校区的建设项目,停车区域,尤其是停车场,变得越来越狭窄。基于这些问题,有必要对 A UNJ 校区的停车安排进行研究。本研究旨在确定 A UNJ 校区的停车需求,并根据施工期间对停车空间的需求安排停车区域。A UNJ 校区的停车位安排考虑了作为管理者的 UNJ 在未来停车位分配方面的政策。通过使用车牌号码调查法和 PSU 计算调查法进行实地调查获得了一手数据,而二手数据则来自于新泽西州立大学的停车库存数据。主要数据是通过 5 月 29 日至 5 月 31 日和 6 月 8 日至 6 月 9 日的实地调查获得的。结果显示,2023 年的停车需求值为 367 PSU 辆,而 UNJ 校区 A 的可用停车场数量为 389 PSU。高峰日为 2023 年 5 月 30 日(星期二),停车累积高峰时段为 13:00-14:00 WIB。由于停车指数接近 100%,这会使驾驶员很难找到空车位,特别是考虑到 UNJ 校区 A 停车场的停车模式是单向旋转的,因此在停车高峰时段找到空车位的机会只有一次或一次性机会。在停车高峰时段找到空车位的机会只有一次,或者驾驶员必须先离开停车场,然后再次进入停车场才能找到空车位。本文还将介绍停车场建模的安排。希望这一初步研究成果能为 A 校区的停车管理方法提供一个概览和建议。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
COST AND TIME ANALYSIS OF DRAINAGE WORKS USING CONVENTIONAL RIVERSTONE METHOD AND PRECAST U-DITCH METHOD CORRELATION ROAD GEOMETRIC ON ROAD DAMAGE CAR PARKING NEEDS ANALYSIS AT CAMPUS A, JAKARTA STATE UNIVERSITY IN THE CONSTRUCTION PERIOD FACTORS CAUSING TIME DELAYS COMPLETION OF CONSTRUCTION PROJECTS(Case Study on Facilities Building Construction ProjectSports Stage 5 Construction of the East Stand) EFFECTIVENESS OF ABSORPTION WELLS USING THE SUNJOTO METHOD TO CONTROL FLOODING IN THE VILLAGE OF NGRASEH BOJONEGORO
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1