Understanding the influence of poor scope management affecting the successful of an IT Project

Angry Ronald Adam, Muhammad Danaparamita
{"title":"Understanding the influence of poor scope management affecting the successful of an IT Project","authors":"Angry Ronald Adam, Muhammad Danaparamita","doi":"10.1109/ICIMTECH.2016.7930315","DOIUrl":null,"url":null,"abstract":"Information technology project failure is the problem which quite hard to avoid. The main problems of IT project failure are scope, time, and cost. These three contains is affecting to each other. Time and cost are the impact of the changing in scope. About 50% – 80% of IT Projects are defined as failure project which is mostly caused by over time and over cost. In client side, the problems come from unrealistic expectations also misunderstanding in collecting requirements in order to develop a system. These problems are leading into many changes in system development and changes will leads into poor scope management. In this research, we will analyze the influence of poor scope management affecting the successful of IT Project. In this research, began by analyze the correlation between Unrealistic Expectation and Changes in Project. The second steps is to analyze the correlation between Changes in Project and Overtime and Overcost. The Third steps it to analyze the Failure Project which defined by acceptance status of client and its correlation with Overcost and Overtime. Statistic method used in this research is Chi-Square. The result shows a tight bond between Unrealistic Expectation to Project Failure.","PeriodicalId":327070,"journal":{"name":"2016 International Conference on Information Management and Technology (ICIMTech)","volume":"12 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2016 International Conference on Information Management and Technology (ICIMTech)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICIMTECH.2016.7930315","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5

Abstract

Information technology project failure is the problem which quite hard to avoid. The main problems of IT project failure are scope, time, and cost. These three contains is affecting to each other. Time and cost are the impact of the changing in scope. About 50% – 80% of IT Projects are defined as failure project which is mostly caused by over time and over cost. In client side, the problems come from unrealistic expectations also misunderstanding in collecting requirements in order to develop a system. These problems are leading into many changes in system development and changes will leads into poor scope management. In this research, we will analyze the influence of poor scope management affecting the successful of IT Project. In this research, began by analyze the correlation between Unrealistic Expectation and Changes in Project. The second steps is to analyze the correlation between Changes in Project and Overtime and Overcost. The Third steps it to analyze the Failure Project which defined by acceptance status of client and its correlation with Overcost and Overtime. Statistic method used in this research is Chi-Square. The result shows a tight bond between Unrealistic Expectation to Project Failure.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
了解不良的范围管理对IT项目成功的影响
信息技术项目失败是一个难以避免的问题。IT项目失败的主要问题是范围、时间和成本。这三者是相互影响的。时间和成本是范围变化的影响。大约50% - 80%的IT项目被定义为失败项目,主要是由于超时和成本过高造成的。在客户端,问题来自于不切实际的期望,以及在收集需求以开发系统方面的误解。这些问题导致了系统开发中的许多变化,而这些变化将导致范围管理不善。在本研究中,我们将分析不良的范围管理对IT项目成功的影响。本研究首先分析了不切实际的期望与项目变更之间的关系。第二步是分析项目变更与加班和超支之间的关系。第三步,分析由客户验收状态定义的失效项目及其与超支和加班的关系。本研究采用的卡方统计方法。结果显示了不切实际的期望与项目失败之间的紧密联系。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Bingar: A computer-assisted speaking exam using integrated multimedia ChinaLatex: Web-based assessment system for ubiquitous Chinese education Understanding the influence of poor scope management affecting the successful of an IT Project The implementation of ERP systems using ASAP methodology: (Case study: OpenERP 9.0 application on sales & distribution module at PT. XYZ) Information system model of succession planning and career path
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1