Initiation of an electrification into operation

H. C. Griffith
{"title":"Initiation of an electrification into operation","authors":"H. C. Griffith","doi":"10.1109/T-AIEE.1931.5055776","DOIUrl":null,"url":null,"abstract":"This paper describes the energizing and putting into service of the Pennsylvania electrification project. The normal and desirable procedure of placing an electrification into service is cited, and the departure from it brought about by the difficulties encountered in actual railway operation are explained. The operating practise — functions of the power director, his assistants, substation operators, and foremen in connection with switching operations, grounding circuits, carding of circuits and manner of obtaining releases — is described and illustrated. All of this is very essential to properly coordinate the work and safeguard the personnel of the construction forces, operating forces, and test men during the transition period of completion and placing into operation a railway electrification project.","PeriodicalId":260406,"journal":{"name":"Journal of the A.I.E.E.","volume":"44 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1931-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of the A.I.E.E.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/T-AIEE.1931.5055776","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

This paper describes the energizing and putting into service of the Pennsylvania electrification project. The normal and desirable procedure of placing an electrification into service is cited, and the departure from it brought about by the difficulties encountered in actual railway operation are explained. The operating practise — functions of the power director, his assistants, substation operators, and foremen in connection with switching operations, grounding circuits, carding of circuits and manner of obtaining releases — is described and illustrated. All of this is very essential to properly coordinate the work and safeguard the personnel of the construction forces, operating forces, and test men during the transition period of completion and placing into operation a railway electrification project.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
电气化开始运行
介绍了宾夕法尼亚州电气化工程的通电投运情况。列举了电气化投入使用的正常和理想的程序,并解释了铁路实际运营中遇到的困难所带来的偏离。操作规程-电力主管、他的助手、变电站操作员和工头在开关操作、接地电路、电路梳理和获得释放方式方面的功能-进行了描述和说明。这对于搞好铁路电气化工程竣工投运过渡期施工部队、操作部队和试验人员的工作协调和人员保障是十分必要的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Looking backward Power transmission A quantitative study of regeneration by inductive feed back National electrical manufacturers association A portable radio direction finder
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1