Impact of Buyer-Supplier Relationships on Improving Supplier Sub-Processes

Petko Yangyozov, Adile Dimitrova, I. Dimitrov
{"title":"Impact of Buyer-Supplier Relationships on Improving Supplier Sub-Processes","authors":"Petko Yangyozov, Adile Dimitrova, I. Dimitrov","doi":"10.1109/CREBUS.2019.8840069","DOIUrl":null,"url":null,"abstract":"The main objective of the article is to present a methodology for dynamically improving the sub-processes of the supplier. The need to improve supplier sub-processes is established on the basis of changes in buyer-supplier relationships. The methodology enables timely adaptation of the organization's strategy and sub-processes when changing buyer-supplier relationships. A computational algorithm is used to reveal the need for improvement of the sub-processes, as well as the guidelines and the scope of the improvements.","PeriodicalId":337771,"journal":{"name":"2019 International Conference on Creative Business for Smart and Sustainable Growth (CREBUS)","volume":"31 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2019 International Conference on Creative Business for Smart and Sustainable Growth (CREBUS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CREBUS.2019.8840069","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The main objective of the article is to present a methodology for dynamically improving the sub-processes of the supplier. The need to improve supplier sub-processes is established on the basis of changes in buyer-supplier relationships. The methodology enables timely adaptation of the organization's strategy and sub-processes when changing buyer-supplier relationships. A computational algorithm is used to reveal the need for improvement of the sub-processes, as well as the guidelines and the scope of the improvements.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
采购-供应商关系对供应商子流程改进的影响
本文的主要目的是提出一种动态改进供应商子过程的方法。改进供应商子过程的需要是在买方和供应商关系变化的基础上确定的。该方法能够在买方-供应商关系发生变化时及时调整组织的战略和子过程。使用计算算法来揭示子过程的改进需求,以及改进的指导方针和范围。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Sustainable Development of an Enterprise Under Industry 4.0 Conditions Employees’ Engagement. Line Managers Make it Happens Turning Knowledge into Innovation and Innovation into an Effective Product Concept Integration of a Photovoltaic Plant to a Building Management System Innovative LED Lighting
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1