Implementasi Over Load Shedding (OLS) Pada Interbus Transformator (IBT) #3 31.5 Mva Dan IBT #5 31.5 MVA Di GI Tello 150/66 kV Untuk Menjaga Keandalan Suplai Ke GI Borongloe, GI Daya Dan GI Mandai

Sarma Thaha, Annisya Adiyanti, Usman Usman, A. R. Sultan
{"title":"Implementasi Over Load Shedding (OLS) Pada Interbus Transformator (IBT) #3 31.5 Mva Dan IBT #5 31.5 MVA Di GI Tello 150/66 kV Untuk Menjaga Keandalan Suplai Ke GI Borongloe, GI Daya Dan GI Mandai","authors":"Sarma Thaha, Annisya Adiyanti, Usman Usman, A. R. Sultan","doi":"10.31963/elekterika.v6i1.3660","DOIUrl":null,"url":null,"abstract":"Interbus transformer (IBT) is transformer that transfer power in different voltage level. Tello Substation has two IBT that change voltage level from 150 kV to 66 kV.  In order to maintain the reliability operation of Tello substation, both IBT must be not allowed to overload. Overload condition could occur if one of the transformers is fault, the normal transformer will be overload.  If an overload condition occurs, the two IBTs may not operate simultaneously. Due to this condition, it is necessary to prevent the occurrence of overload condition by applying overload shedding (OLS). This OLS application can prevent overload on the transformer if one of the transformers out of service due to fault condition. The OLS relay will work when the load on the IBT has reached its setting, by releasing the load on the 66 kV system line according to the OLS scheme as a precautionary step before all transformers trip. This research uses a case study on the Makassar Subsystem, which is one of the Sulbagsel System's electrical systems. The results showed that the amount of load that needed to be removed when implementing the OLS scheme at IBT #3 and IBT #5 31.5 MVA GI Tello was 16.86 MW. The OLS and OCR schemes are coordinated with the OLS setting current at each IBT GI Tello is 302.5 A, while the setting current for OCR at each IBT GI Tello is 330 and  time multiple setting ( tms) is 1.96","PeriodicalId":316017,"journal":{"name":"Jurnal Teknologi Elekterika","volume":"7 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-05-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Teknologi Elekterika","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31963/elekterika.v6i1.3660","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Interbus transformer (IBT) is transformer that transfer power in different voltage level. Tello Substation has two IBT that change voltage level from 150 kV to 66 kV.  In order to maintain the reliability operation of Tello substation, both IBT must be not allowed to overload. Overload condition could occur if one of the transformers is fault, the normal transformer will be overload.  If an overload condition occurs, the two IBTs may not operate simultaneously. Due to this condition, it is necessary to prevent the occurrence of overload condition by applying overload shedding (OLS). This OLS application can prevent overload on the transformer if one of the transformers out of service due to fault condition. The OLS relay will work when the load on the IBT has reached its setting, by releasing the load on the 66 kV system line according to the OLS scheme as a precautionary step before all transformers trip. This research uses a case study on the Makassar Subsystem, which is one of the Sulbagsel System's electrical systems. The results showed that the amount of load that needed to be removed when implementing the OLS scheme at IBT #3 and IBT #5 31.5 MVA GI Tello was 16.86 MW. The OLS and OCR schemes are coordinated with the OLS setting current at each IBT GI Tello is 302.5 A, while the setting current for OCR at each IBT GI Tello is 330 and  time multiple setting ( tms) is 1.96
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
在变压器拦截(IBT) 3 . 5.mva和IBT 5 .5 Mva在GI Tello 150/66 kV中实现重载载
总线间变压器(IBT)是一种传输不同电压电平功率的变压器。泰罗变电站有两个IBT,电压等级从150千伏到66千伏。为了保证泰罗变电站的可靠运行,两台IBT都不能过载。如果其中一台变压器发生故障,则会出现过载情况,正常变压器将过载。如果发生过载,可能导致两台ibt不能同时运行。由于这种情况,有必要通过施加过载脱落(OLS)来防止过载情况的发生。这个OLS应用程序可以防止过载的变压器,如果其中一个变压器的服务,由于故障条件。OLS继电器将在IBT上的负载达到其设定时工作,根据OLS方案释放66千伏系统线路上的负载,作为所有变压器跳闸之前的预防步骤。本研究以Sulbagsel系统的电气系统之一望加锡子系统为例进行了研究。结果表明,在ibt# 3和ibt# 5 31.5 MVA GI Tello上实施OLS方案时需要去除的负载量为16.86 MW。OLS和OCR方案协调,每个IBT GI台的OLS设定电流为302.5 A,每个IBT GI台的OCR设定电流为330,时间倍数设定(tms)为1.96
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Perancangan Sistem Human Machine Interface (HMI) untuk Monitoring Daya Sinkronisasi Paralel Genset Sistem Kendali Hidrogen Pada HCl Burner Menggunakan Controller Yokogawa Pengujian Long-Short Term Memory (LSTM) Pada Prediksi Trafik Lalu Lintas Menggunakan Multi Server Analisis Efisiensi Generator Pada GT21 Blok 2 Pembangkit Listrik Tenaga Gas Dan Uap PT. CEPA Sengkang Analasis Penerapan Teknologi Traffic Steering SD-WAN Menggunakan Perangkat FortiGate
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1