{"title":"A long-pulse neutral beam power supply system for LBL 20 kV, 10 a sources","authors":"V. J. Honey, W. Baker, M. L. Fitzgerald","doi":"10.1109/PESC.1976.7072905","DOIUrl":null,"url":null,"abstract":"This paper describes the power supplies and control system for the LBL 20 kV, 10 A, 10 sec long-pulse neutral beam source test facility, now in operation. Such sources are used in a number of existing and planned fusion power experiments.","PeriodicalId":208049,"journal":{"name":"1970 IEEE Power Electronics Specialists Conference","volume":"28 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1976-06-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"1970 IEEE Power Electronics Specialists Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PESC.1976.7072905","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
This paper describes the power supplies and control system for the LBL 20 kV, 10 A, 10 sec long-pulse neutral beam source test facility, now in operation. Such sources are used in a number of existing and planned fusion power experiments.