MANAGEMENT ANALYSIS OF CONSTRUCTION PROJECT CIPAGER CHECK DAM OF KUNINGAN REGENCY

Dian Rosdiana, Saihul Anwar
{"title":"MANAGEMENT ANALYSIS OF CONSTRUCTION PROJECT CIPAGER CHECK DAM OF KUNINGAN REGENCY","authors":"Dian Rosdiana, Saihul Anwar","doi":"10.33603/jgst.v1i1.1033","DOIUrl":null,"url":null,"abstract":"Project management is one important aspect in the application of knowledge, expertise and skills to achieve the goals or objectives that have been determined in order to obtain optimum results in terms of performance, time, quality and safety. This study was conducted to analyze the Check Dam Project Construction Management Cipager River Kuningan start of calculating volume,implementation works, supplies (tools, labor, materials)budget plan, method, barchart, s curve, analysis critical path method and cash flow. The results showed that the budget plan costs incurred to complete the CipagerCheck Dam RiverOf Kuningan RegencyRp. 6.140.922.000,00(Six billion one hundred forty million Nine hundred twenty two thousand rupiah) including 10% VAT. Then by using analysis critical path method, completion takes as long as 25 weeks, or 175 calendar days.","PeriodicalId":419103,"journal":{"name":"Journal of Green Science and Technology","volume":"88 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-02-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Green Science and Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33603/jgst.v1i1.1033","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Project management is one important aspect in the application of knowledge, expertise and skills to achieve the goals or objectives that have been determined in order to obtain optimum results in terms of performance, time, quality and safety. This study was conducted to analyze the Check Dam Project Construction Management Cipager River Kuningan start of calculating volume,implementation works, supplies (tools, labor, materials)budget plan, method, barchart, s curve, analysis critical path method and cash flow. The results showed that the budget plan costs incurred to complete the CipagerCheck Dam RiverOf Kuningan RegencyRp. 6.140.922.000,00(Six billion one hundred forty million Nine hundred twenty two thousand rupiah) including 10% VAT. Then by using analysis critical path method, completion takes as long as 25 weeks, or 175 calendar days.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
库宁安县建设工程密码坝管理分析
项目管理是应用知识、专业知识和技能来实现既定目标的一个重要方面,这些目标是为了在性能、时间、质量和安全方面获得最佳结果而确定的。本研究分析了库宁安拦河坝工程施工管理的开工计算量、实施工程量、物资(工具、人工、材料)预算方案、方法、柱状图、s曲线、分析关键路径法和现金流。结果表明,预算计划的费用,以完成库宁安RegencyRp的CipagerCheck坝河。6140.922.000,00(六十亿一亿四千万玖佰贰万卢比)包括10%的增值税。然后通过分析关键路径方法,完成需要长达25周,或175日历天。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
COST AND TIME ANALYSIS OF DRAINAGE WORKS USING CONVENTIONAL RIVERSTONE METHOD AND PRECAST U-DITCH METHOD CORRELATION ROAD GEOMETRIC ON ROAD DAMAGE CAR PARKING NEEDS ANALYSIS AT CAMPUS A, JAKARTA STATE UNIVERSITY IN THE CONSTRUCTION PERIOD FACTORS CAUSING TIME DELAYS COMPLETION OF CONSTRUCTION PROJECTS(Case Study on Facilities Building Construction ProjectSports Stage 5 Construction of the East Stand) EFFECTIVENESS OF ABSORPTION WELLS USING THE SUNJOTO METHOD TO CONTROL FLOODING IN THE VILLAGE OF NGRASEH BOJONEGORO
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1