{"title":"Tackling Demolition Waste – An en route to Sustainable Development","authors":"Nadia Qamar, A. Khurram","doi":"10.33317/ssurj.v8i1.34","DOIUrl":null,"url":null,"abstract":"In Pakistan, construction and demolition waste(CDW) is generated in voluminous amount each year. CDW iswidely ill-handled and ultimately fed to landfills causing harm tothe already alarming environmental conditions. In order tosearch for the solution of this drastic matter, a study was done,which is explained in this paper. This paper presents the studydone at a demolition site near Karachi, in Sindh while thedemolition works were being carried out. At the site there wereold barracks which were being demolished. Before the demolitionworks were commenced, the site was surveyed and structuralcomponents of the barracks were counted and their dimensionswere measured. When the demolition was over, the demolishedwaste was calculated which comprised of concrete and masonryrubble, steel round bars, steel doors, steel windows, steel ceiling,steel girders, steel main gate, and plastic water tank. This studyinterpreted that construction and demolition (C&D) works wereprogressing considering the works’ deadline and the clients’requirements but the ecosystem’s ecology and the environmentalhealth were not taken into account. Recommendations are madeto handle CDW properly throughout its lifecycle. Theserecommendations aim to provide technological and logicalsolutions to grip CDW. The recommendations include wastereduction and reusing waste, life cycle assessment and costing,environmental and economic impact, material flow analysis, andadvanced computerized-tools.","PeriodicalId":341241,"journal":{"name":"Sir Syed University Research Journal of Engineering & Technology","volume":"10 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-12-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Sir Syed University Research Journal of Engineering & Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33317/ssurj.v8i1.34","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1
Abstract
In Pakistan, construction and demolition waste(CDW) is generated in voluminous amount each year. CDW iswidely ill-handled and ultimately fed to landfills causing harm tothe already alarming environmental conditions. In order tosearch for the solution of this drastic matter, a study was done,which is explained in this paper. This paper presents the studydone at a demolition site near Karachi, in Sindh while thedemolition works were being carried out. At the site there wereold barracks which were being demolished. Before the demolitionworks were commenced, the site was surveyed and structuralcomponents of the barracks were counted and their dimensionswere measured. When the demolition was over, the demolishedwaste was calculated which comprised of concrete and masonryrubble, steel round bars, steel doors, steel windows, steel ceiling,steel girders, steel main gate, and plastic water tank. This studyinterpreted that construction and demolition (C&D) works wereprogressing considering the works’ deadline and the clients’requirements but the ecosystem’s ecology and the environmentalhealth were not taken into account. Recommendations are madeto handle CDW properly throughout its lifecycle. Theserecommendations aim to provide technological and logicalsolutions to grip CDW. The recommendations include wastereduction and reusing waste, life cycle assessment and costing,environmental and economic impact, material flow analysis, andadvanced computerized-tools.