TREE PRESERVATION ORDER (ACT 172) ADOPTION PROCESS WITHIN THE NATIONAL DEVELOPMENT PLANNING FRAMEWORK

Nik Adlin Nik Mohamed Sukri, Z. Ismail, Wan Tarmeze Wan Ariffin, R. M. Nordin
{"title":"TREE PRESERVATION ORDER (ACT 172) ADOPTION PROCESS WITHIN THE NATIONAL DEVELOPMENT PLANNING FRAMEWORK","authors":"Nik Adlin Nik Mohamed Sukri, Z. Ismail, Wan Tarmeze Wan Ariffin, R. M. Nordin","doi":"10.21837/pm.v18i14.831","DOIUrl":null,"url":null,"abstract":"This study was conducted to obtain comprehensive information on the process of Tree Preservation Order or TPO (Act 172) adoption by the states in the context of National Development Planning Framework (NDPF) that includes the formulation and adoption of TPO Rules. The study was part of the authors’ research in finding answers to the lack of TPO (Act 172) implementation in the country. The data were acquired through consultation with PLANMalaysia and state JPBDs, and by reviewing the agencies’ documents. The results, presented in the form of process flowcharts, would be useful for the current and future research in making evaluation concerning the adequacy of planning and actions taken during the adoption process that would ensure TPO (Act 172) implementation. This study preliminarily concludes that the planning and actions taken were adequate, i.e., done in an orderly manner and followed the procedures common to the NDPF. However, the next step in ensuring that the TPO (Act 172) adoption is effective, TPO (Act 172) implementation must be put as high priority in the work plans of each related agency.","PeriodicalId":223592,"journal":{"name":"PLANNING MALAYSIA JOURNAL","volume":"62 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-11-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"PLANNING MALAYSIA JOURNAL","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.21837/pm.v18i14.831","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

This study was conducted to obtain comprehensive information on the process of Tree Preservation Order or TPO (Act 172) adoption by the states in the context of National Development Planning Framework (NDPF) that includes the formulation and adoption of TPO Rules. The study was part of the authors’ research in finding answers to the lack of TPO (Act 172) implementation in the country. The data were acquired through consultation with PLANMalaysia and state JPBDs, and by reviewing the agencies’ documents. The results, presented in the form of process flowcharts, would be useful for the current and future research in making evaluation concerning the adequacy of planning and actions taken during the adoption process that would ensure TPO (Act 172) implementation. This study preliminarily concludes that the planning and actions taken were adequate, i.e., done in an orderly manner and followed the procedures common to the NDPF. However, the next step in ensuring that the TPO (Act 172) adoption is effective, TPO (Act 172) implementation must be put as high priority in the work plans of each related agency.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
树木保护令(第172号法令)在国家发展规划框架内的采用程序
本研究旨在全面了解在国家发展规划框架(NDPF)背景下,各邦采用树木保护令或TPO(172号法案)的过程,包括TPO规则的制定和采用。这项研究是作者寻找该国缺乏TPO(第172号法案)实施的答案的研究的一部分。这些数据是通过与马来西亚计划和各州jpbd协商,并通过审查机构的文件获得的。以过程流程图的形式提出的结果,将有助于当前和未来的研究,以评估在通过过程中是否充分规划和采取行动,以确保TPO(第172号法令)的执行。这项研究的初步结论是,所采取的规划和行动是充分的,即有条不紊地进行,并遵循了民阵的共同程序。然而,下一步要确保TPO(第172号法案)的有效采用,TPO(第172号法案)的实施必须在每个相关机构的工作计划中作为高度优先事项。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
QUALITY OF DESIGNS AND FEATURES OF SMALL URBAN GREEN SPACES IN PETALING JAYA TOWN, MALAYSIA LOCATION HOUSING AFFORDABILITY INDEX: ANALYSING THE RELATIONSHIPS SPATIAL DEMOGRAPHIC DATA FOR PLANNING AND RESEARCH ASSESSING MRT FEEDER BUS SERVICES PERFORMANCE THROUGH PASSENGER’S SATISFACTION LEVEL IN THE SELECTED STATIONS OF KLANG VALLEY, MALAYSIA ASSESSMENT ON THE IMPLEMENTATION OF PLOT RATIO AS A DEVELOPMENT CONTROL TOOL IN GEORGE TOWN, PENANG
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1