Summary of Application of Fuzzy Mathematics in Construction Project Management

Dongyou Tong, Yueming Wang
{"title":"Summary of Application of Fuzzy Mathematics in Construction Project Management","authors":"Dongyou Tong, Yueming Wang","doi":"10.4236/wjet.2021.93028","DOIUrl":null,"url":null,"abstract":"Construction project management is an important aspect of civil engineering construction. How to use scientific and efficient methods to effectively manage construction projects is the focus of construction project development under the current situation. This article discusses the application of fuzzy mathematics in construction project management. The study found that in the process of construction project management, it was found that a single fuzzy mathematical method was difficult to adapt to the current complex and changeable construction projects. Combining fuzzy mathematics with other management methods and computer applications can better simplify complex things, reduce human subjectivity, increase calculation speed, and achieve a combination of qualitative and quantitative research; selection of optimization schemes and risk assessment, etc. All have a good effect, and can better deal with possible or uncertain things and emergencies in the process of project management. At the same time, combining fuzzy mathematics with heuristic algorithms or meta-heuristic algorithms can make research more objective, improve management efficiency and calculation speed.","PeriodicalId":344331,"journal":{"name":"World Journal of Engineering and Technology","volume":"103 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-07-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"World Journal of Engineering and Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4236/wjet.2021.93028","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

Abstract

Construction project management is an important aspect of civil engineering construction. How to use scientific and efficient methods to effectively manage construction projects is the focus of construction project development under the current situation. This article discusses the application of fuzzy mathematics in construction project management. The study found that in the process of construction project management, it was found that a single fuzzy mathematical method was difficult to adapt to the current complex and changeable construction projects. Combining fuzzy mathematics with other management methods and computer applications can better simplify complex things, reduce human subjectivity, increase calculation speed, and achieve a combination of qualitative and quantitative research; selection of optimization schemes and risk assessment, etc. All have a good effect, and can better deal with possible or uncertain things and emergencies in the process of project management. At the same time, combining fuzzy mathematics with heuristic algorithms or meta-heuristic algorithms can make research more objective, improve management efficiency and calculation speed.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
模糊数学在建设项目管理中的应用综述
建设项目管理是土木工程建设的一个重要方面。如何运用科学、高效的方法对建设项目进行有效的管理,是当前形势下建设项目发展的重点。本文探讨了模糊数学在建设项目管理中的应用。研究发现,在建设项目管理过程中,单一的模糊数学方法难以适应当前复杂多变的建设项目。将模糊数学与其他管理方法和计算机应用相结合,可以更好地简化复杂的事物,减少人的主观性,提高计算速度,实现定性与定量研究的结合;优化方案选择、风险评估等。都有很好的效果,可以更好的处理项目管理过程中可能或不确定的事情和突发事件。同时,将模糊数学与启发式算法或元启发式算法相结合,可以使研究更加客观,提高管理效率和计算速度。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Research on Influencing Factors of Reservoir Construction Risk Based on Interpretative Structural Modeling Preliminary Exploration on the Application of Saussure Sign Concept in Bio-Inspired Design: A Case of Tiantoushui Doll-Design Comparative Analysis of Hybrid Controllers of Done Systems (UPFC) and Interphase Power Regulators Type RPI 30p15 on Contingency Management in Electrical Networks Bureaucratic Factors Impeding the Delivery of Infrastructure at the Metropolitan Municipal and District Assemblies (MMDAs) in Ghana Summary of Application of Fuzzy Mathematics in Construction Project Management
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1