Inter-discipline cross-shift teams for station improvements-a case study

B. Prendergast
{"title":"Inter-discipline cross-shift teams for station improvements-a case study","authors":"B. Prendergast","doi":"10.1109/ASMC.1995.484399","DOIUrl":null,"url":null,"abstract":"Summary form only given. With the decreased lifetime of new technologies and increased cost of new facilities, there is increased pressure to ramp successfully, and as efficiently as possibly. At Fab 10, Intel's European Semiconductor Manufacturing site, this continuously challenging environment dictated a need for flexible cross-functional teams to take ownership of problems and solutions real-time. Focusing on the support team involved with the Amat 5000 dielectric by equipment set, a Station Improvement Team (SIT) was setup who's charter was to continuous improvement performance as measured by objective indicators measurable at the station. This paper details how the team coordinated Bay layout, improved operating logistics producing 30% utilization increase, reduced scrap by 2X and achieved synergy across shifts resulting in improved procedures on the floor.","PeriodicalId":237741,"journal":{"name":"Proceedings of SEMI Advanced Semiconductor Manufacturing Conference and Workshop","volume":"52 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1995-11-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of SEMI Advanced Semiconductor Manufacturing Conference and Workshop","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ASMC.1995.484399","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Summary form only given. With the decreased lifetime of new technologies and increased cost of new facilities, there is increased pressure to ramp successfully, and as efficiently as possibly. At Fab 10, Intel's European Semiconductor Manufacturing site, this continuously challenging environment dictated a need for flexible cross-functional teams to take ownership of problems and solutions real-time. Focusing on the support team involved with the Amat 5000 dielectric by equipment set, a Station Improvement Team (SIT) was setup who's charter was to continuous improvement performance as measured by objective indicators measurable at the station. This paper details how the team coordinated Bay layout, improved operating logistics producing 30% utilization increase, reduced scrap by 2X and achieved synergy across shifts resulting in improved procedures on the floor.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
跨学科的跨班次的车站改进小组-一个案例研究
只提供摘要形式。随着新技术寿命的缩短和新设施成本的增加,成功和尽可能高效地斜坡的压力越来越大。在英特尔的欧洲半导体制造基地Fab 10,这种不断挑战的环境要求灵活的跨职能团队实时掌握问题和解决方案。针对涉及Amat 5000电介质设备组的支持团队,成立了一个站点改进小组(SIT),该小组的职责是通过站点可测量的客观指标来持续改进性能。本文详细介绍了团队如何协调海湾布局,改善运营物流,提高30%的利用率,减少2倍的废品率,并实现跨班次的协同作用,从而改进了地板上的流程。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Automation and statistical process control of a single wafer etcher in a manufacturing environment Equipment management system (EMS) Reconvergent specular detection of material defects on silicon Managing multi-chamber tool productivity Advanced dielectric etching with a high density plasma tool: issues and challenges in manufacturing
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1