{"title":"Open-circuited CT misoperation and investigation","authors":"D. Costello","doi":"10.1109/CPRE.2014.6799015","DOIUrl":null,"url":null,"abstract":"A wire crimping error caused a current transformer (CT) to become open-circuited under load, a relay to operate, and an industrial plant outage. The wiring error was corrected, and the relay, internally damaged by severe overvoltage, was put back into service. Root cause analysis predicted and exposed the damage and led to corrective actions. This paper revisits the IEEE dielectric strength standard, safe design and work procedures regarding CTs, and what happens when a CT is open-circuited under load. The case study emphasizes the critical importance of commissioning tests and root cause analysis to power system reliability.","PeriodicalId":285252,"journal":{"name":"2014 67th Annual Conference for Protective Relay Engineers","volume":"84 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-04-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 67th Annual Conference for Protective Relay Engineers","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CPRE.2014.6799015","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

A wire crimping error caused a current transformer (CT) to become open-circuited under load, a relay to operate, and an industrial plant outage. The wiring error was corrected, and the relay, internally damaged by severe overvoltage, was put back into service. Root cause analysis predicted and exposed the damage and led to corrective actions. This paper revisits the IEEE dielectric strength standard, safe design and work procedures regarding CTs, and what happens when a CT is open-circuited under load. The case study emphasizes the critical importance of commissioning tests and root cause analysis to power system reliability.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
开路CT误操作及调查
电线压接错误会导致电流互感器(CT)在负载下开路,继电器无法工作,以及工业设备停电。接线错误得到纠正,继电器因严重过电压而内部损坏,重新投入使用。根本原因分析预测和揭露损害,并采取纠正措施。本文回顾了IEEE介电强度标准、CT的安全设计和工作程序,以及CT在负载下开路时会发生什么。案例研究强调了调试试验和根本原因分析对电力系统可靠性的重要性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Testing the tester, common pitfalls testing Microprocessor based relays Improvements in the operation of a distance relay during resistive faults Preventing transformer mis-operations for external faults Open-circuited CT misoperation and investigation Enhanced distribution feeder fault location
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1