CONSTRUCTION WASTE MANAGEMENT IN UAE: AN EXPLORATORY STUDY

B. Hittini, A. Shibeika
{"title":"CONSTRUCTION WASTE MANAGEMENT IN UAE: AN EXPLORATORY STUDY","authors":"B. Hittini, A. Shibeika","doi":"10.2495/sc190581","DOIUrl":null,"url":null,"abstract":"In 2016, 9.68 million tons of solid waste were generated in Abu Dhabi alone where 67.8% was sent to dumpsites and landfills. In the same year, the construction and demolishing (C&D) industry produced 47% of the non-hazardous waste. This research aims to investigate the C&D waste management in UAE’s construction industry, specifically in Abu Dhabi based on (a) official resources identifying authorized entities, regulations, implementation guidelines, and causes behind waste generation in UAE’ C&D industry; and (b) unstructured interviews with construction professionals in Abu Dhabi revealing the waste management consideration process, enhancement methods, professionals’ responsibilities and views toward the topic. While Abu Dhabi’s sustainability framework (Estidama) requires a submittal of C&D Waste Management Plan (CDWMP) prior to any construction activity asking for a minimum of 30% waste diversion from landfills, relevant literature highlighted awareness as an effective factor in C&D management. Interviews for this study have shown that a lack of awareness is still affecting the C&D waste management and control negatively. Interviewees have also contributed in understanding the waste management consideration process, enhancement methods, professionals’ responsibilities and views toward the topic highlighting that implementation practices seem to seek Estidama certification but not a sustainable environment.","PeriodicalId":224230,"journal":{"name":"The Sustainable City XIII","volume":"36 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-12-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"The Sustainable City XIII","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2495/sc190581","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

Abstract

In 2016, 9.68 million tons of solid waste were generated in Abu Dhabi alone where 67.8% was sent to dumpsites and landfills. In the same year, the construction and demolishing (C&D) industry produced 47% of the non-hazardous waste. This research aims to investigate the C&D waste management in UAE’s construction industry, specifically in Abu Dhabi based on (a) official resources identifying authorized entities, regulations, implementation guidelines, and causes behind waste generation in UAE’ C&D industry; and (b) unstructured interviews with construction professionals in Abu Dhabi revealing the waste management consideration process, enhancement methods, professionals’ responsibilities and views toward the topic. While Abu Dhabi’s sustainability framework (Estidama) requires a submittal of C&D Waste Management Plan (CDWMP) prior to any construction activity asking for a minimum of 30% waste diversion from landfills, relevant literature highlighted awareness as an effective factor in C&D management. Interviews for this study have shown that a lack of awareness is still affecting the C&D waste management and control negatively. Interviewees have also contributed in understanding the waste management consideration process, enhancement methods, professionals’ responsibilities and views toward the topic highlighting that implementation practices seem to seek Estidama certification but not a sustainable environment.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
阿联酋建筑垃圾管理:一项探索性研究
2016年,仅阿布扎比就产生了968万吨固体废物,其中67.8%被送往垃圾场和垃圾填埋场。同年,建筑和拆除行业产生了47%的无害废物。本研究旨在调查阿联酋建筑行业,特别是阿布扎比建筑行业的C&D废物管理,基于(a)官方资源,确定授权实体,法规,实施指南,以及阿联酋C&D行业废物产生背后的原因;(b)与阿布扎比建筑专业人员的非结构化访谈,揭示废物管理的考虑过程、增强方法、专业人员的责任和对该主题的看法。虽然阿布扎比的可持续发展框架(Estidama)要求在任何建筑活动之前提交C&D废物管理计划(CDWMP),要求从垃圾填埋场转移至少30%的废物,但相关文献强调了意识是C&D管理的有效因素。本研究的访谈表明,意识的缺乏仍然对C&D废物管理和控制产生负面影响。受访者也有助于了解废物管理的考虑过程、增强方法、专业人员的责任和对该主题的看法,强调实施实践似乎寻求Estidama认证,而不是可持续的环境。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
INSTITUTIONAL PERCEPTIONS AND BARRIERS TO MULTIFUNCTIONAL CEMETERIES HYDRAULIC PERFORMANCE OF PERMEABLE ASPHALT AND PICP IN SWMM, VALIDATED BY LABORATORY DATA PLANNING AND SUSTAINABLE DEVELOPMENT OF URBAN LOGISTICS: FROM INTERNATIONAL GOALS TO REGIONAL REALIZATION CONSTRUCTION WASTE MANAGEMENT IN UAE: AN EXPLORATORY STUDY PUBLIC SPACES AND PRIVATE CONFLICTS IN THE NEW URBAN AGENDA
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1