Investigation into the measured power-quality results and special output-limitation outcomes at Taichung Power Plant's onshore wind farm in Taiwan

Li Wang, Chien-Hsiang Yu, Chuan-Chieh Yeh, Bing-Lin Kuan, Xiu-Yu Lu, A. Prokhorov
{"title":"Investigation into the measured power-quality results and special output-limitation outcomes at Taichung Power Plant's onshore wind farm in Taiwan","authors":"Li Wang, Chien-Hsiang Yu, Chuan-Chieh Yeh, Bing-Lin Kuan, Xiu-Yu Lu, A. Prokhorov","doi":"10.1109/ICPS.2017.7945114","DOIUrl":null,"url":null,"abstract":"This paper investigates and analyzes the measured power-quality results of an onshore wind farm with three wind-turbine generators connected to the power grid of Taiwan Power System. The three 2-MW wind permanent-magnet synchronous generators of the studied Taichung Power Plant's onshore wind farm are connected to the extra-high-voltage bus of 161 kV through a step-up three-winding distribution transformer of 161/23.9/11.9 kV, 60/30/30 MVA. The measured results were recorded from October 8th, 2015 to November 13th, 2015 for total 37 days. The recorded power-quality results include current harmonics, voltage flickers, and voltage variations. Special output-limitation outcomes of the studied wind farm were also recorded. According to the analyzed long-term measurement results, the power-quality indices such as system frequency, voltage variations, voltage flickers based on ΔV10, and total demand distortion of current at the point of common coupling can meet the grid code of Taiwan Power Company.","PeriodicalId":201563,"journal":{"name":"2017 IEEE/IAS 53rd Industrial and Commercial Power Systems Technical Conference (I&CPS)","volume":"31 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-06-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2017 IEEE/IAS 53rd Industrial and Commercial Power Systems Technical Conference (I&CPS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICPS.2017.7945114","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

This paper investigates and analyzes the measured power-quality results of an onshore wind farm with three wind-turbine generators connected to the power grid of Taiwan Power System. The three 2-MW wind permanent-magnet synchronous generators of the studied Taichung Power Plant's onshore wind farm are connected to the extra-high-voltage bus of 161 kV through a step-up three-winding distribution transformer of 161/23.9/11.9 kV, 60/30/30 MVA. The measured results were recorded from October 8th, 2015 to November 13th, 2015 for total 37 days. The recorded power-quality results include current harmonics, voltage flickers, and voltage variations. Special output-limitation outcomes of the studied wind farm were also recorded. According to the analyzed long-term measurement results, the power-quality indices such as system frequency, voltage variations, voltage flickers based on ΔV10, and total demand distortion of current at the point of common coupling can meet the grid code of Taiwan Power Company.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
台湾台中电厂陆上风电场电能质量测量结果及特殊输出限制结果之研究
本文对台湾电力系统三台风力发电机并网的陆上风电场电能质量实测结果进行了调查分析。台中电厂陆上风电场的3台2兆瓦风力永磁同步发电机通过161/23.9/11.9 kV、60/30/30 MVA的升压三绕组配电变压器与161 kV超高压母线相连。测量结果记录于2015年10月8日至2015年11月13日,共37天。记录的电能质量结果包括电流谐波、电压闪烁和电压变化。还记录了所研究风电场的特殊输出限制结果。长期测量结果分析表明,系统频率、电压变化、基于ΔV10的电压闪变、共耦合点电流总需求畸变等电能质量指标均满足台湾电力公司电网规范要求。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Investigation into the measured power-quality results and special output-limitation outcomes at Taichung Power Plant's onshore wind farm in Taiwan Special field measurement results of an onshore wind farm connected to power grid of Taiwan Power System subject to Typhoon Matmo Demand side management in mixed residential/commercial buildings with PV on site generation Control strategies for improving energy efficiency of train operation and reducing DC traction peak power in mass Rapid Transit System Electrical safety of electric vehicles
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1