A. Vinogradov, A. Vinogradova, I. Golikov, A. Lansberg
{"title":"Methodology for Selecting Locations for Installation of Sectioning Points and Step-by-step Voltage Regulation","authors":"A. Vinogradov, A. Vinogradova, I. Golikov, A. Lansberg","doi":"10.33267/2072-9642-2023-5-32-37","DOIUrl":null,"url":null,"abstract":"Information about the reliability of electricity supply to rural consumers and the quality of electricity supplied to them is given. A point for sectioning and stepped voltage regulation has been developed, which makes it possible to prevent unreasonable interruptions in the power supply to rural consumers and provides a given voltage level for the consumers at a distance from the power supply source. A technique has been developed for choosing the location for installing a sectioning point and step-by-step voltage regulation according to various criteria.","PeriodicalId":169300,"journal":{"name":"Machinery and Equipment for Rural Area","volume":"42 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-05-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Machinery and Equipment for Rural Area","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33267/2072-9642-2023-5-32-37","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Information about the reliability of electricity supply to rural consumers and the quality of electricity supplied to them is given. A point for sectioning and stepped voltage regulation has been developed, which makes it possible to prevent unreasonable interruptions in the power supply to rural consumers and provides a given voltage level for the consumers at a distance from the power supply source. A technique has been developed for choosing the location for installing a sectioning point and step-by-step voltage regulation according to various criteria.