{"title":"Integration of standards for successful project management","authors":"Andres Sanabria","doi":"10.33422/6th.omeaconf.2020.09.213","DOIUrl":null,"url":null,"abstract":"The projects from their origin have sought to response to a particular need or problem, this is how through the time the human being has had to develop different techniques which allow him to elaborate good practices to the project management. In addition to the above, this has led to the fact that today there are multiple international standards applied to project management, which sometimes, these standards diverge in the way they initiate, plan, execute, control and finalize the projects, but they converge in the search for their success. The present paper, makes a comparison of four of the most used standards around the world as the PMBOK, ISO 21500, APMBOK, and Prince 2, in order to evaluate the performance of each one of those standards and consequently, to illustrate the common features which applied to reality facilitate the success in project management.","PeriodicalId":110924,"journal":{"name":"Proceedings of ‏The 6th International Conference on Opportunities and Challenges in Management, Economics and Accounting","volume":"73 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-09-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of ‏The 6th International Conference on Opportunities and Challenges in Management, Economics and Accounting","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33422/6th.omeaconf.2020.09.213","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The projects from their origin have sought to response to a particular need or problem, this is how through the time the human being has had to develop different techniques which allow him to elaborate good practices to the project management. In addition to the above, this has led to the fact that today there are multiple international standards applied to project management, which sometimes, these standards diverge in the way they initiate, plan, execute, control and finalize the projects, but they converge in the search for their success. The present paper, makes a comparison of four of the most used standards around the world as the PMBOK, ISO 21500, APMBOK, and Prince 2, in order to evaluate the performance of each one of those standards and consequently, to illustrate the common features which applied to reality facilitate the success in project management.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
整合成功的项目管理标准
项目从其起源开始就寻求对特定需求或问题的响应,这就是人类如何通过时间来开发不同的技术,使他能够详细阐述项目管理的良好实践。除此之外,这导致了这样一个事实,即今天有多种国际标准应用于项目管理,有时,这些标准在启动、计划、执行、控制和完成项目的方式上存在分歧,但在寻求成功的过程中却趋于一致。本文对世界上最常用的四种标准PMBOK、ISO 21500、APMBOK和Prince 2进行了比较,以评估每一种标准的性能,从而说明应用于现实的共同特征,促进项目管理的成功。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
The influence of Stakeholder management on the success of Social Development Projects within a higher education institution: A case study Do multiple tasks enhance dishonesty in tournament incentives environment? Integration of standards for successful project management Digital Transformation in the Value Chain – Effects on Major Stakeholders Effective Corporate Image Management as a Strategy for Enhancing Profitability
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1