The Pelton Hydro-Electric Development

J. M. Mullarkey
{"title":"The Pelton Hydro-Electric Development","authors":"J. M. Mullarkey","doi":"10.1061/JPWEAM.0000164","DOIUrl":null,"url":null,"abstract":"Project operated by Portland General Electric Co, and located on Deschutes River, 10 mi northwest of town of Madras, consists of 204-ft high thin arch dam, power house containing three vertical 55,000-hp Francis turbines driving 40,000-kw generators, and regulating dam consisting of rock fill section and concrete center spillway; dam site geology; features of arch dam; foundation grouting; spillway model study; establishment of complete construction plant.","PeriodicalId":136288,"journal":{"name":"Journal of the Power Division","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"1958-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of the Power Division","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1061/JPWEAM.0000164","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Project operated by Portland General Electric Co, and located on Deschutes River, 10 mi northwest of town of Madras, consists of 204-ft high thin arch dam, power house containing three vertical 55,000-hp Francis turbines driving 40,000-kw generators, and regulating dam consisting of rock fill section and concrete center spillway; dam site geology; features of arch dam; foundation grouting; spillway model study; establishment of complete construction plant.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
佩尔顿水电开发项目
该项目由波特兰通用电气公司运营,位于马德拉斯镇西北10英里处的Deschutes河上,包括204英尺高的细拱坝,包含三个55,000马力的垂直弗朗西斯涡轮机驱动40,000千瓦发电机的发电厂,以及由填石段和混凝土中心溢洪道组成的调节坝;坝址地质;拱坝特点;基础灌浆;溢洪道模型研究;建立完整的建筑工厂。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Dynamic Analysis Using Modal Synthesis Power Conversion Systems of the 21st Century Method for Dynamic Testing of Dams Discussion of “Integrated River System Operation in a Major Flood” Discussion of Flood Protection of Crystal River Unit 3 Nuclear Plant by Ronald M. Noble and Bert Simpson
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1