Saudi Aramco experience — Islanding scheme for Manifa Central Processing Facility

K. Mustafa, K. Garg, Rajkumar Swaminathan
{"title":"Saudi Aramco experience — Islanding scheme for Manifa Central Processing Facility","authors":"K. Mustafa, K. Garg, Rajkumar Swaminathan","doi":"10.1109/PCICEUROPE.2014.6900052","DOIUrl":null,"url":null,"abstract":"Manifa Central Processing Facility (CPF), the fifth largest oil field in the world, is connected by 25 manmade islands and 20 kilometers of causeways. The current production capacity of heavy crude oil at the CPF is 500,000 barrels per day (bpd). The full production capacity of the plant is 900,000 bpd, which the facility will meet in 2014. The power plant generation includes two combustion gas turbine (CGT) generators and two heat recovery steam generators (HRSGs) providing steam to two steam turbine generators (STGs), with a total generation capacity of about 500 MW. Two tie lines at 115 kV connect the Manifa CPF to the external utility system. A power management system controls the Manifa CPF frequency once the Manifa CPF islands from the external grid. Some of the severe external disturbances require Manifa islanding operation in less than 15 cycles to maintain system stability. This very critical CPF requires the ability to quickly identify an islanding condition correctly. This paper discusses the islanding scheme design details for local and remote signals. For significant power exchange with an external grid, local measurement-based islanding can correctly and quickly identify the islanding condition.","PeriodicalId":196668,"journal":{"name":"2014 Petroleum and Chemical Industry Conference Europe","volume":"34 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-06-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 Petroleum and Chemical Industry Conference Europe","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PCICEUROPE.2014.6900052","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

Manifa Central Processing Facility (CPF), the fifth largest oil field in the world, is connected by 25 manmade islands and 20 kilometers of causeways. The current production capacity of heavy crude oil at the CPF is 500,000 barrels per day (bpd). The full production capacity of the plant is 900,000 bpd, which the facility will meet in 2014. The power plant generation includes two combustion gas turbine (CGT) generators and two heat recovery steam generators (HRSGs) providing steam to two steam turbine generators (STGs), with a total generation capacity of about 500 MW. Two tie lines at 115 kV connect the Manifa CPF to the external utility system. A power management system controls the Manifa CPF frequency once the Manifa CPF islands from the external grid. Some of the severe external disturbances require Manifa islanding operation in less than 15 cycles to maintain system stability. This very critical CPF requires the ability to quickly identify an islanding condition correctly. This paper discusses the islanding scheme design details for local and remote signals. For significant power exchange with an external grid, local measurement-based islanding can correctly and quickly identify the islanding condition.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
沙特阿美的经验-曼尼法中央处理设施的孤岛方案
曼尼法中央处理设施(CPF)是世界第五大油田,由25个人造岛屿和20公里长的堤道连接。CPF目前的重质原油生产能力为50万桶/天。该工厂的全部生产能力为90万桶/天,该设施将在2014年达到。发电厂发电包括两台燃气轮机(CGT)发电机和两台热回收蒸汽发生器(HRSGs),为两台蒸汽轮机发电机(stg)提供蒸汽,总发电能力约为500兆瓦。两条115千伏的联络线将曼尼法CPF连接到外部公用事业系统。一旦曼尼法CPF脱离外部电网,电源管理系统控制曼尼法CPF的频率。一些严重的外部干扰要求曼尼法岛在不到15个周期内运行,以保持系统的稳定性。这个非常关键的CPF要求能够快速正确地识别孤岛条件。本文讨论了本地信号和远程信号的孤岛方案设计细节。对于与外部电网的重大电力交换,基于局部测量的孤岛可以正确、快速地识别孤岛状态。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Challenges with integration and operation of offshore oil & gas platforms connected to an offshore wind power plant Pyrotechnic current limiting devices — From design to operation Humidity effects in substations Saudi Aramco experience — Islanding scheme for Manifa Central Processing Facility Power loss ride-through in a variable speed drive system
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1