{"title":"Individual customers' influence on the operation of virtual power plants","authors":"B. Buchholz, D. Nestle, A. Kießling","doi":"10.1109/PES.2009.5275401","DOIUrl":null,"url":null,"abstract":"With respect to the political 20-20-20 goals of the European Union, the structure of the electricity network is subject to major changes. The German legal framework has encouraged the installation and operation of renewable energy systems and cogeneration units. As a consequence, in the city of Mannheim, Germany, more and more distributed generators feed into the distribution grid. In September 2008, more than 300 small PV systems and cogeneration units have been connected to the distribution grid, with a steadily rising number and installed capacity. The distribution grid can still host that number and capacity of distributed generation without any major integration efforts. However, to reach the above mentioned political goals, the electricity grid planners will face the challenge to integrate a much higher number of distributed generators as well as higher fluctuating capacity while maintaining and even improving reliability and security of supply. In 2007, the German government has launched the technology program “E-Energy” [1]. Six research teams are currently developing new ICT infrastructures for six model regions in order to increase the efficiency of the energy system with ICT as enabling technology. This paper elaborates on the decentralized approach for a virtual power plant that researchers will apply to the city of Mannheim as one model city. Chapter 1 explains the role of individual customers who cooperate in a swarm like an organism. Chapter 2 provides the technical concept behind the new system architecture. Chapter 3 shows first experiences with the field test in Mannheim and Chapter 4 concludes the paper.","PeriodicalId":258632,"journal":{"name":"2009 IEEE Power & Energy Society General Meeting","volume":"11 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2009-07-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"12","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2009 IEEE Power & Energy Society General Meeting","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PES.2009.5275401","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 12

Abstract

With respect to the political 20-20-20 goals of the European Union, the structure of the electricity network is subject to major changes. The German legal framework has encouraged the installation and operation of renewable energy systems and cogeneration units. As a consequence, in the city of Mannheim, Germany, more and more distributed generators feed into the distribution grid. In September 2008, more than 300 small PV systems and cogeneration units have been connected to the distribution grid, with a steadily rising number and installed capacity. The distribution grid can still host that number and capacity of distributed generation without any major integration efforts. However, to reach the above mentioned political goals, the electricity grid planners will face the challenge to integrate a much higher number of distributed generators as well as higher fluctuating capacity while maintaining and even improving reliability and security of supply. In 2007, the German government has launched the technology program “E-Energy” [1]. Six research teams are currently developing new ICT infrastructures for six model regions in order to increase the efficiency of the energy system with ICT as enabling technology. This paper elaborates on the decentralized approach for a virtual power plant that researchers will apply to the city of Mannheim as one model city. Chapter 1 explains the role of individual customers who cooperate in a swarm like an organism. Chapter 2 provides the technical concept behind the new system architecture. Chapter 3 shows first experiences with the field test in Mannheim and Chapter 4 concludes the paper.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
个体客户对虚拟电厂运行的影响
就欧盟20-20-20的政治目标而言,电网的结构将发生重大变化。德国的法律框架鼓励安装和运行可再生能源系统和热电联产装置。因此,在德国曼海姆市,越来越多的分布式发电机进入配电网。2008年9月,300多个小型光伏系统和热电联产装置已接入配电网,其数量和装机容量稳步上升。配电网仍然可以承载分布式发电的数量和容量,而无需进行任何主要的整合工作。然而,为了实现上述政治目标,电网规划者将面临一个挑战,即在保持甚至提高供电可靠性和安全性的同时,整合更多数量的分布式发电机和更高的波动容量。2007年,德国政府启动了“E-Energy”技术计划[1]。六个研究小组目前正在为六个示范区域开发新的信通技术基础设施,以便以信通技术作为使能技术提高能源系统的效率。本文详细阐述了研究人员将曼海姆市作为一个示范城市应用于虚拟电厂的分散方法。第1章解释了个体客户的作用,他们像有机体一样在群体中合作。第2章提供了新系统架构背后的技术概念。第三章介绍了在曼海姆进行现场试验的初步经验,第四章对本文进行了总结。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Substation fault analysis requirements On field experience results related to high-impedance faults in power distribution system Reactive power compensation using Z-source based photovoltaic system How can flicker level be determined before a customer is connected to the electric grid Transmission expansion and pricing in Colombia: An appraisal of current practices
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1