Improving BES reliability at large generating station locations

T. Baker
{"title":"Improving BES reliability at large generating station locations","authors":"T. Baker","doi":"10.1109/CPRE.2014.6799019","DOIUrl":null,"url":null,"abstract":"The integrity and reliability of the bulk power electrical systems could be significantly enhanced by providing redundant or back up protection for the bus differentials, unit differentials, feeder differentials, and transformer differentials applied in generating station high voltage switchyards. These additions could be provided at a modest cost as outlined in the paper. Many existing large generating stations are also not equipped with out-of-step, inadvertent energization, pole flashover, and slow breaker closing during synchronizing protection schemes. The lack of these functions could have a negative impact on the bulk power system. They could be added at a relatively low cost to improve the reliability of the electrical system and at the same time significantly enhance the protection at large generating stations.","PeriodicalId":285252,"journal":{"name":"2014 67th Annual Conference for Protective Relay Engineers","volume":"6 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-04-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 67th Annual Conference for Protective Relay Engineers","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CPRE.2014.6799019","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The integrity and reliability of the bulk power electrical systems could be significantly enhanced by providing redundant or back up protection for the bus differentials, unit differentials, feeder differentials, and transformer differentials applied in generating station high voltage switchyards. These additions could be provided at a modest cost as outlined in the paper. Many existing large generating stations are also not equipped with out-of-step, inadvertent energization, pole flashover, and slow breaker closing during synchronizing protection schemes. The lack of these functions could have a negative impact on the bulk power system. They could be added at a relatively low cost to improve the reliability of the electrical system and at the same time significantly enhance the protection at large generating stations.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
提高大型电站位置BES的可靠性
通过为电站高压开关站中使用的母线差速器、单元差速器、馈线差速器和变压器差速器提供冗余或备用保护,可以显著提高大容量电力系统的完整性和可靠性。如文件所述,可以以适当的费用提供这些补充。许多现有的大型电站在同步保护方案中也没有配备失步、误通电、极闪络和断路器慢合闸。这些功能的缺乏可能会对大容量电力系统产生负面影响。它们可以以较低的成本增加,以提高电力系统的可靠性,同时大大增强大型电站的保护。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Testing the tester, common pitfalls testing Microprocessor based relays Improvements in the operation of a distance relay during resistive faults Preventing transformer mis-operations for external faults Open-circuited CT misoperation and investigation Enhanced distribution feeder fault location
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1