R. Mueller, R. W. Moses, David Wilson, P. Carrato, Troy King
{"title":"Lunar Mega Project: Processes, Work Flow, and Terminology of the Terrestrial Construction Industry versus the Space Industry","authors":"R. Mueller, R. W. Moses, David Wilson, P. Carrato, Troy King","doi":"10.1061/9780784483374.109","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":345627,"journal":{"name":"Earth and Space 2021","volume":"63 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-04-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Earth and Space 2021","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1061/9780784483374.109","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}