THE INFLUENCE AND THE COMPARISON OF TURKISH PROCUREMENT SYSTEMS ON CONSTRUCTION PROJECT PERFORMANCE

İlknur Akıner, M. E. Akıner
{"title":"THE INFLUENCE AND THE COMPARISON OF TURKISH PROCUREMENT SYSTEMS ON CONSTRUCTION PROJECT PERFORMANCE","authors":"İlknur Akıner, M. E. Akıner","doi":"10.33422/irset.2018.12.25","DOIUrl":null,"url":null,"abstract":"Procurement system is the invisible part of the construction project organizations and has an important effect to maximize the project performance. It rather concerns the management of the construction project process and participants to reach the common goals of completing the project under the budget, quality, and timeframes. There is a wide range of procurement systems that can be used to manage the construction of a project. Design-Build, Traditional and Turnkey procurement systems, which contain Lump Sum, Unit price and Cost plus a fee contract types and methods, are mostly used procurement systems in the Turkish construction industry. Each of these systems has its advantages and disadvantages which the owner must consider before the project begins. The evaluation of procurement systems and to select the right system is a complex decision problem and depends on many factors for the owner. Factors that the owner should consider are the complexity of the project, the relative importance of budget or schedule and the in-house expertise the owner has to manage the project. Within this study, a survey was conducted with some of the construction project owners in Turkey. The objective of this study is the empirical performance-based investigation of the procurement systems mostly used in the Turkish construction industry today. Another goal is to determine the influences of these procurement systems on project cost, time and quality factors in Turkish construction sector and to determine the extent of these systems that are covering the needs of project owner (client).","PeriodicalId":401829,"journal":{"name":"Proceedings of The International conference on innovative research in Science Engineering & Technology","volume":"18 4 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-12-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of The International conference on innovative research in Science Engineering & Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33422/irset.2018.12.25","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Procurement system is the invisible part of the construction project organizations and has an important effect to maximize the project performance. It rather concerns the management of the construction project process and participants to reach the common goals of completing the project under the budget, quality, and timeframes. There is a wide range of procurement systems that can be used to manage the construction of a project. Design-Build, Traditional and Turnkey procurement systems, which contain Lump Sum, Unit price and Cost plus a fee contract types and methods, are mostly used procurement systems in the Turkish construction industry. Each of these systems has its advantages and disadvantages which the owner must consider before the project begins. The evaluation of procurement systems and to select the right system is a complex decision problem and depends on many factors for the owner. Factors that the owner should consider are the complexity of the project, the relative importance of budget or schedule and the in-house expertise the owner has to manage the project. Within this study, a survey was conducted with some of the construction project owners in Turkey. The objective of this study is the empirical performance-based investigation of the procurement systems mostly used in the Turkish construction industry today. Another goal is to determine the influences of these procurement systems on project cost, time and quality factors in Turkish construction sector and to determine the extent of these systems that are covering the needs of project owner (client).
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
土耳其采购制度对建设项目绩效的影响及比较
采购制度是建设项目组织中无形的组成部分,对项目绩效最大化具有重要作用。它更关心的是建设项目过程的管理和参与者,以达到在预算、质量和时间框架下完成项目的共同目标。有各种各样的采购系统可用于管理项目的建设。设计-建造、传统和交钥匙采购系统,包括一次性付款、单价和成本加费用合同类型和方法,是土耳其建筑业中最常用的采购系统。每一种系统都有其优点和缺点,业主必须在项目开始前考虑这些问题。采购系统的评估和选择是一个复杂的决策问题,它取决于许多因素。业主应该考虑的因素是项目的复杂性,预算或进度的相对重要性,以及业主管理项目的内部专业知识。在本研究中,对土耳其的一些建筑项目业主进行了调查。本研究的目的是实证绩效为基础的采购系统的调查,主要用于土耳其建筑业今天。另一个目标是确定这些采购制度对土耳其建筑部门的项目成本、时间和质量因素的影响,并确定这些制度在多大程度上满足了项目所有者(客户)的需要。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
APPLICATION OF GEOMIMICRY TO ENGINEERING PROBLEMS:GILSONITE AS A SOLUTION TO LEAKY WELLBORES DESIGN OF HIGH EFFICIENCY 4 KW INDUCTION MOTOR EFFECT OF THE POLARIZATION OF TRIPOLAR ELECTRODES ON ELECTRICAL NERVE BLOCK IN-VIVO SYNTHESIS AND CHARACTERIZATION OF NOVEL ABA-TYPE AMPHIPHILIC BLOCK COPOLYMERS THE INFLUENCE AND THE COMPARISON OF TURKISH PROCUREMENT SYSTEMS ON CONSTRUCTION PROJECT PERFORMANCE
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1