A Conceptual Model for Contractor Assessment System in the Electricity Project with Tender

Alprianto Zainuddin, Andri D. Setiawan, A. Hidayatno
{"title":"A Conceptual Model for Contractor Assessment System in the Electricity Project with Tender","authors":"Alprianto Zainuddin, Andri D. Setiawan, A. Hidayatno","doi":"10.1145/3468013.3468641","DOIUrl":null,"url":null,"abstract":"The selection of an EPC Contractor in Procurement for Indonesia's electricity system faces several challenges, especially for strategic projects such as transmission and substations. The procurement of goods/services in the electricity sector considers several evaluation criteria such as technical experience, administrative requirements, prices, and how the provider has met the applicable provisions in Indonesia. This research aimed to design a conceptual model to determine the EPC Tender Process Criteria for Electricity Construction by using an experimental design approach to measure the value of the 4 (four) main criteria used in the evaluation and actual implementation of EPC contractors. This conceptual model included stakeholders involved as executors of tenders or policy-makers directly related to achieving organizational goals. The data processing method used the Multicriteria decision-making method (MCDM) such as the Analytic Network Process (ANP) and the Promethee Method.","PeriodicalId":129225,"journal":{"name":"Proceedings of the 4th Asia Pacific Conference on Research in Industrial and Systems Engineering","volume":"19 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-05-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 4th Asia Pacific Conference on Research in Industrial and Systems Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1145/3468013.3468641","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The selection of an EPC Contractor in Procurement for Indonesia's electricity system faces several challenges, especially for strategic projects such as transmission and substations. The procurement of goods/services in the electricity sector considers several evaluation criteria such as technical experience, administrative requirements, prices, and how the provider has met the applicable provisions in Indonesia. This research aimed to design a conceptual model to determine the EPC Tender Process Criteria for Electricity Construction by using an experimental design approach to measure the value of the 4 (four) main criteria used in the evaluation and actual implementation of EPC contractors. This conceptual model included stakeholders involved as executors of tenders or policy-makers directly related to achieving organizational goals. The data processing method used the Multicriteria decision-making method (MCDM) such as the Analytic Network Process (ANP) and the Promethee Method.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
电力招标项目承包商评价体系的概念模型
在印尼电力系统采购中选择EPC承包商面临着几个挑战,特别是在输变电等战略项目中。电力部门的货物/服务采购考虑几个评估标准,如技术经验、行政要求、价格以及供应商如何满足印度尼西亚的适用规定。本研究旨在设计一个概念模型,通过使用实验设计方法来衡量EPC承包商评估和实际实施中使用的4(4)个主要标准的价值,从而确定EPC电力建设招标过程标准。这个概念模型包括作为投标执行者或与实现组织目标直接相关的政策制定者的利益相关者。数据处理方法采用多准则决策方法(MCDM),如分析网络过程(ANP)和Promethee方法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Simplification of the Calcine Transfer Control System Architecture for Ferronickel Projects in System Reliability Assessment The Role of Safety Leadership, Safety Objective, and Working Conditions in Safety Performance in Pharmaceutical Industries: A Conceptual Model Analysis of Loading Time Improvement on Finished Product Warehouse Using Lean Six Sigma and Discrete Event Simulation Developing a Sustainable Green Battery Swapping Industry Model: A Conceptual Framework The Impact of Employability Skills on Employers' Satisfaction: A Conceptual Model for Fresh Graduates of Engineering
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1