{"title":"Causes of construction delay for housing projects in Malaysia","authors":"M. Z. Ramli, A. Nordin, Nursyadzatul Tasnim Roslin, N. B. Hamid, N. S. Azman, N. Zahari","doi":"10.1063/1.5118038","DOIUrl":null,"url":null,"abstract":"Every organization that is involved with the construction industry undoubtedly has delayed progress at some phase in their project or development. Delay in construction project become a common situ...","PeriodicalId":112912,"journal":{"name":"APPLIED PHYSICS OF CONDENSED MATTER (APCOM 2019)","volume":"58 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-07-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"APPLIED PHYSICS OF CONDENSED MATTER (APCOM 2019)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1063/1.5118038","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1
Abstract
Every organization that is involved with the construction industry undoubtedly has delayed progress at some phase in their project or development. Delay in construction project become a common situ...