{"title":"SDWT requires tools to be successful","authors":"E. Rose, R. Odom, R. Murphy, L. Behnke","doi":"10.1109/ASMC.1995.484398","DOIUrl":null,"url":null,"abstract":"This paper will describe two Harris Semiconductor success stories and discuss the SDWT (self-directed work team) tools used to be successful. The first story concerns a union factory that, faced with the potential loss of a major customer, tried a new approach to creating dialog between teams from each company. The second story concerns a wafer fabrication line where teams were in place for two years with little signs of improvement. By introducing TOC and TPM, in combination with a structured team environment, the same group of people made significant operational improvements within six months (40% increase in volume, 2x improvement in die yield (quality), 23% reduction in cycle time, and 16% improvement in line yield).","PeriodicalId":237741,"journal":{"name":"Proceedings of SEMI Advanced Semiconductor Manufacturing Conference and Workshop","volume":"36 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1995-11-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of SEMI Advanced Semiconductor Manufacturing Conference and Workshop","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ASMC.1995.484398","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1
Abstract
This paper will describe two Harris Semiconductor success stories and discuss the SDWT (self-directed work team) tools used to be successful. The first story concerns a union factory that, faced with the potential loss of a major customer, tried a new approach to creating dialog between teams from each company. The second story concerns a wafer fabrication line where teams were in place for two years with little signs of improvement. By introducing TOC and TPM, in combination with a structured team environment, the same group of people made significant operational improvements within six months (40% increase in volume, 2x improvement in die yield (quality), 23% reduction in cycle time, and 16% improvement in line yield).