{"title":"Research of remote backup protection functioning at the software and hardware complex RTDS","authors":"R. Isakov, A. Ferenets","doi":"10.1109/ICIEAM.2017.8076214","DOIUrl":null,"url":null,"abstract":"Remote backup protection is installed at the ends of the power line of 35–220 kV and provides detection of short-circuit on the low-voltage side of branch transformers. To support remote protection on 110 kV lines and above with two or multi-way power feed, it is mandatory to implement a three-stage remote protection from interphase short-circuit (phase-to-phase fault). To implement line protection with remote protection on a substation (in case of protection equipment operation failure, breaker failure on high voltage side and signal transfer device failure) seems to be more difficult comparing to a line short-circuit. It is related to limited possibilities of line protection sensitivity and, in many cases, operation parameters of a loaded line that define relay protection stage protection significantly exceed nominal power of the branch transformer.","PeriodicalId":428982,"journal":{"name":"2017 International Conference on Industrial Engineering, Applications and Manufacturing (ICIEAM)","volume":"13 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2017 International Conference on Industrial Engineering, Applications and Manufacturing (ICIEAM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICIEAM.2017.8076214","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 7
Abstract
Remote backup protection is installed at the ends of the power line of 35–220 kV and provides detection of short-circuit on the low-voltage side of branch transformers. To support remote protection on 110 kV lines and above with two or multi-way power feed, it is mandatory to implement a three-stage remote protection from interphase short-circuit (phase-to-phase fault). To implement line protection with remote protection on a substation (in case of protection equipment operation failure, breaker failure on high voltage side and signal transfer device failure) seems to be more difficult comparing to a line short-circuit. It is related to limited possibilities of line protection sensitivity and, in many cases, operation parameters of a loaded line that define relay protection stage protection significantly exceed nominal power of the branch transformer.