{"title":"Settlement of Compensation for Land Affected by the Solo-Yogyakarta Toll Road Construction Project at the Klaten District Court","authors":"Marisa Kurnianingsih, Alfath Sartanto, Anindhita Nurfaatin Sukirman","doi":"10.53017/ujsah.154","DOIUrl":null,"url":null,"abstract":"National strategic projects that are being intensively carried out by the government do not escape the emergence of disputes or disputes. This study raises the case of compensation due to the construction of expressway infrastructure or the Solo-Yogyakarta toll road, precisely in the Klaten area, which is experiencing problems, one of which is the determination of the compensation value for the affected community. The matter was brought to trial at the Klaten District Court with a fast-paced trial process carried out by the Panel of Judges. This research was structured using the juridical-empirical method. This study will describe the settlement of compensation for land affected by the Solo-Yogyakarta toll road at the Klaten District Court and explore facts to find out the obstacles experienced from the perspective of the applicant in the settlement of compensation for land affected by the Solo-Yogyakarta toll road.","PeriodicalId":315613,"journal":{"name":"Urecol Journal. Part H: Social, Art, and Humanities","volume":"98 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-06-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Urecol Journal. Part H: Social, Art, and Humanities","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.53017/ujsah.154","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
National strategic projects that are being intensively carried out by the government do not escape the emergence of disputes or disputes. This study raises the case of compensation due to the construction of expressway infrastructure or the Solo-Yogyakarta toll road, precisely in the Klaten area, which is experiencing problems, one of which is the determination of the compensation value for the affected community. The matter was brought to trial at the Klaten District Court with a fast-paced trial process carried out by the Panel of Judges. This research was structured using the juridical-empirical method. This study will describe the settlement of compensation for land affected by the Solo-Yogyakarta toll road at the Klaten District Court and explore facts to find out the obstacles experienced from the perspective of the applicant in the settlement of compensation for land affected by the Solo-Yogyakarta toll road.