Readiness for lean procurement in construction projects

M. Suresh, R. A. Nathan
{"title":"Readiness for lean procurement in construction projects","authors":"M. Suresh, R. A. Nathan","doi":"10.1108/ci-07-2019-0067","DOIUrl":null,"url":null,"abstract":"The purpose of this paper is to identify, analyse and categorize the major factors affecting lean procurement (LP) in a construction project of a company in India using total interpretive structural modelling (TISM) approach. The readiness factors identified help the managers to recognize the areas that lack, i.e. purchase, stocks and receipts, and provide importance to the successful implementation of LP in those areas. This study further intends to examine the hierarchical interrelationships among the factors identified using dependence and driving power.,Ten factors were identified from literature review, and expert opinions were collected from the organization which is in construction phase in India. Scheduled interviews were conducted based on questionnaire survey in the organizations to identify the relevance of the relations among the factors. Matrix impact cross-multiplication applied to classification analysis uses dependence and driving power to understand the hierarchical relationship among the factors identified.,Results indicate that supplier selection is the key readiness factor for LP. The manager needs to concentrate more on readiness factors to formulate execution process of LP for the betterment of the construction project undergoing organization in India. The readiness factors help the manager to identify the target area for LP execution.,This study would be useful for researchers and practitioners to understand the readiness factors before starting the implementation process of LP in construction projects. The managers of companies undergoing construction project can use the outcome of the present study to implement LP in a competent way. Basing the priorities of attention on the ten readiness LP factors in the appropriate order of importance, as suggested by this study, can give project managers a more scientific basis in which to specify the level of attention required for each of the factors to implement readiness in LP.,The present study identifies the readiness factors related to LP, especially for construction project. None of the researchers have studied readiness factors of LP for organizations undergoing construction projects. This is the first attempt made to analyze the relationship between LP readiness factors and TISM approach in construction project organization.","PeriodicalId":221945,"journal":{"name":"Construction Innovation: Information, Process, Management","volume":"135 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"54","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Construction Innovation: Information, Process, Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/ci-07-2019-0067","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 54

Abstract

The purpose of this paper is to identify, analyse and categorize the major factors affecting lean procurement (LP) in a construction project of a company in India using total interpretive structural modelling (TISM) approach. The readiness factors identified help the managers to recognize the areas that lack, i.e. purchase, stocks and receipts, and provide importance to the successful implementation of LP in those areas. This study further intends to examine the hierarchical interrelationships among the factors identified using dependence and driving power.,Ten factors were identified from literature review, and expert opinions were collected from the organization which is in construction phase in India. Scheduled interviews were conducted based on questionnaire survey in the organizations to identify the relevance of the relations among the factors. Matrix impact cross-multiplication applied to classification analysis uses dependence and driving power to understand the hierarchical relationship among the factors identified.,Results indicate that supplier selection is the key readiness factor for LP. The manager needs to concentrate more on readiness factors to formulate execution process of LP for the betterment of the construction project undergoing organization in India. The readiness factors help the manager to identify the target area for LP execution.,This study would be useful for researchers and practitioners to understand the readiness factors before starting the implementation process of LP in construction projects. The managers of companies undergoing construction project can use the outcome of the present study to implement LP in a competent way. Basing the priorities of attention on the ten readiness LP factors in the appropriate order of importance, as suggested by this study, can give project managers a more scientific basis in which to specify the level of attention required for each of the factors to implement readiness in LP.,The present study identifies the readiness factors related to LP, especially for construction project. None of the researchers have studied readiness factors of LP for organizations undergoing construction projects. This is the first attempt made to analyze the relationship between LP readiness factors and TISM approach in construction project organization.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
准备在建筑项目中进行精益采购
本文的目的是识别,分析和分类的主要因素影响精益采购(LP)在一家公司的建设项目在印度使用总解释结构建模(TISM)方法。确定的准备因素有助于管理人员认识到缺乏的领域,即采购,库存和收据,并为在这些领域成功实施LP提供了重要性。本研究旨在进一步探讨使用依赖与驱动力之间的层级相互关系。从文献综述中确定了十个因素,并从印度处于建设阶段的组织中收集了专家意见。在组织中进行了基于问卷调查的预定访谈,以确定因素之间关系的相关性。将矩阵影响交叉乘法应用于分类分析中,利用依赖性和驱动力来理解所识别因素之间的层次关系。结果表明,供应商选择是低成本生产的关键准备因素。管理者需要更多地关注准备因素,以制定LP的执行流程,以改善在印度组织的建设项目。准备因素帮助管理者确定LP执行的目标区域。本研究将有助于研究人员和实务人员在建筑项目实施LP前了解准备因素。建设项目公司的管理者可以利用本研究的结果以胜任的方式实施LP。根据本研究提出的建议,将关注的优先级以适当的重要性顺序建立在十个准备就绪的LP因素上,可以为项目经理提供更科学的依据,以指定每个因素在LP中实施准备就绪所需的关注水平。本研究确定了与LP相关的准备因素,特别是对于建设项目。目前还没有研究人员对正在进行建设项目的组织的LP准备因素进行研究。本文首次尝试分析建设项目组织中LP准备度因素与TISM方法之间的关系。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
The feasibility of transparent solar panels for high-rise building façade in Sri Lanka Detecting skewed pricing in tenders for public-sector projects Understanding the key risks in circular construction projects: from systematic review to conceptual framework A critical review of quantity surveying education in an offsite construction perspective: strategies for up-skilling Development and testing of lean simulation game on set-based design
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1