Detecting skewed pricing in tenders for public-sector projects

Khaled Hesham Hyari, Mujahed Thneibat
{"title":"Detecting skewed pricing in tenders for public-sector projects","authors":"Khaled Hesham Hyari, Mujahed Thneibat","doi":"10.1108/ci-06-2023-0131","DOIUrl":null,"url":null,"abstract":"Purpose Skewed pricing is a typical tactic used by tenderers in unit price projects to gain additional advantages at the expense of the owner or other competing tenderers. This paper aims to describe the development of a model for detecting skewed pricing in competitive tendering for unit price contracts. Design/methodology/approach The model evaluates how much the offered unit rates for work items deviate from the reasonable rate identified from the item’s submitted unit rates. Item rate deviations are integrated into a total deviation score for each submitted tender based on the relative weight of the work item to the total project amount. The model allows for assigning higher weights to work items that are more prone to skewed pricing, such as those that are performed early and those that are expected to experience quantity fluctuations. Findings The paper presents a detection model that uses only the submitted prices of the competing tenderers to perform the needed calculations, which reduces subjectivity in identifying skewed tenders. Two examples are given to demonstrate how the model may be used to detect skewed tenders. Originality/value The model supports tendering officials in the challenging task of identifying skewed tenders, which is required by rules and regulations governing public procurement. The model’s ease of use is expected to make it more widely used as a decision-support tool during the tender evaluation stage of real-world projects.","PeriodicalId":221945,"journal":{"name":"Construction Innovation: Information, Process, Management","volume":"56 41","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-11-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Construction Innovation: Information, Process, Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/ci-06-2023-0131","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Purpose Skewed pricing is a typical tactic used by tenderers in unit price projects to gain additional advantages at the expense of the owner or other competing tenderers. This paper aims to describe the development of a model for detecting skewed pricing in competitive tendering for unit price contracts. Design/methodology/approach The model evaluates how much the offered unit rates for work items deviate from the reasonable rate identified from the item’s submitted unit rates. Item rate deviations are integrated into a total deviation score for each submitted tender based on the relative weight of the work item to the total project amount. The model allows for assigning higher weights to work items that are more prone to skewed pricing, such as those that are performed early and those that are expected to experience quantity fluctuations. Findings The paper presents a detection model that uses only the submitted prices of the competing tenderers to perform the needed calculations, which reduces subjectivity in identifying skewed tenders. Two examples are given to demonstrate how the model may be used to detect skewed tenders. Originality/value The model supports tendering officials in the challenging task of identifying skewed tenders, which is required by rules and regulations governing public procurement. The model’s ease of use is expected to make it more widely used as a decision-support tool during the tender evaluation stage of real-world projects.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
发现公共部门项目投标中的扭曲定价
扭曲定价是招标人在单价项目中使用的一种典型策略,以牺牲业主或其他竞争投标者的利益为代价,获得额外的优势。本文的目的是描述一个模型的发展,用于检测单位价格合同竞争性招标中的扭曲定价。该模型评估为工作项提供的单位费率与从项目提交的单位费率确定的合理费率之间的偏差程度。根据工作项相对于总项目金额的相对权重,项目率偏差被集成到每个提交投标的总偏差评分中。该模型允许为更容易产生定价偏差的工作项分配更高的权重,例如那些早期执行的工作项和那些预计会经历数量波动的工作项。本文提出了一种检测模型,该模型仅使用竞争投标者提交的价格来执行所需的计算,从而减少了识别扭曲投标的主观性。给出了两个例子来演示如何使用该模型来检测倾斜投标。原创性/价值该模型支持招标官员识别扭曲投标的挑战性任务,这是管理公共采购的规则和条例所要求的。该模型的易用性有望使其在实际项目的评标阶段作为决策支持工具得到更广泛的应用。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
The feasibility of transparent solar panels for high-rise building façade in Sri Lanka Detecting skewed pricing in tenders for public-sector projects Understanding the key risks in circular construction projects: from systematic review to conceptual framework A critical review of quantity surveying education in an offsite construction perspective: strategies for up-skilling Development and testing of lean simulation game on set-based design
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1