Outage planning: human performance considerations

D. R. Desaulniers
{"title":"Outage planning: human performance considerations","authors":"D. R. Desaulniers","doi":"10.1109/HFPP.1992.283419","DOIUrl":null,"url":null,"abstract":"Human performance is an important factor in the assessment of outage plans and shutdown risk. An assessment process for examining plant outage working conditions against six fundamental methods for supporting reliable human performance is described. Results of a generic analysis using this process are presented. It is concluded that detailed and structured analyses of the human functions essential to support outage activities and accident mitigation strategies can be used to identify (1) weaknesses in outage plans and (2) methods for decreasing shutdown risks by improving support to reliable human performance.<<ETX>>","PeriodicalId":150946,"journal":{"name":"Conference Record for 1992 Fifth Conference on Human Factors and Power Plants","volume":"64 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Conference Record for 1992 Fifth Conference on Human Factors and Power Plants","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/HFPP.1992.283419","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Human performance is an important factor in the assessment of outage plans and shutdown risk. An assessment process for examining plant outage working conditions against six fundamental methods for supporting reliable human performance is described. Results of a generic analysis using this process are presented. It is concluded that detailed and structured analyses of the human functions essential to support outage activities and accident mitigation strategies can be used to identify (1) weaknesses in outage plans and (2) methods for decreasing shutdown risks by improving support to reliable human performance.<>
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
停机计划:人员性能考虑
人员绩效是评估停机计划和停机风险的一个重要因素。一个评估过程,检查工厂停机工作条件对支持可靠的人的表现的六种基本方法进行了描述。使用这一过程的一般分析的结果被提出。结论是,对支持停机活动和事故缓解策略所必需的人员功能进行详细和结构化的分析,可用于确定(1)停机计划中的弱点和(2)通过提高对可靠人员绩效的支持来降低停机风险的方法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
When technicians use computer programs: approaches to procedure writing The evaluation of crew factors in aircrew team performance Performance of nuclear power plant or automated system depends on operator's availability Getting the attention of senior management for human factors issues: quantitative survey data Progress of I&C system and control room design in TEPCO nuclear power plants
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1