Improving the Efficiency of Combination of Construction and Installation Works During the Underground Phase Under Conditions of Compacted Construction

A. Radkevych, M. Netesa, A. Netesa
{"title":"Improving the Efficiency of Combination of Construction and Installation Works During the Underground Phase Under Conditions of Compacted Construction","authors":"A. Radkevych, M. Netesa, A. Netesa","doi":"10.15802/stp2021/245669","DOIUrl":null,"url":null,"abstract":"Purpose. The urbanization development in the twenty-first century is characterized by increasing the share of multifunctional infrastructure complexes among the total volume of new and renovated construction. Projects with a developed stylobate part are characterized by significant demand, as well as placing parking lots in the space of underground floors. Such solutions make it possible to effectively use the underground space while minimizing the filling of 1–5 floors. The latter requirement is typical for the construction of historic centers, where urban restrictions regulate the maximum height of the building. The research is aimed at increasing the efficiency of works provided they are combined during the arrangement of underground phase of multifunctional complexes, which are built in the historic part of cities, in a densely built-up area and extremely limited space. Methodology. The authors reviewed the world experience in the installation of multifunctional complexes and introduced best practices in organizational and technological solutions during the development of design and technological documentation for the arrangement of underground phase of the object «New construction of a multifunctional complex with parking at 25 Volodymyra Vernadskoho Street, Dnipro.» The main construction processes of the underground phase arrangement in difficult conditions of compacted construction are considered and the critical elements during their design are determined. The technological sequence of performing related works by various contractors has been improved in order to create a time reserve and increase the reliability of the entire technological process. Findings. Organizational and technological solutions have been identified that allow combining construction and installation processes of underground phase of multifunctional complexes with a significant number of subcontractors under conditions of compacted construction, as well as under complex hydrogeological conditions or during construction in the historic buildings of the central part of cities. Originality. The authors for the first time conducted research in the field of underground phase arrangement given the location of construction equipment in the limited space of the construction site in the historic part of Dnipro and proposed a number of solutions to increase the reliability of the main construction process. Practical value. Based on the results obtained, one can correct the location of construction equipment and determine the rational sequence of construction and installation works, as well as predict the further development of construction technology. These studies can be useful during the study of disciplines «Technology of Construction Production», «Technology of special works», for the organization of scientific and practical seminars, refresher courses and more.","PeriodicalId":120413,"journal":{"name":"Science and Transport Progress. Bulletin of Dnipropetrovsk National University of Railway Transport","volume":"43 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-08-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Science and Transport Progress. Bulletin of Dnipropetrovsk National University of Railway Transport","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.15802/stp2021/245669","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Purpose. The urbanization development in the twenty-first century is characterized by increasing the share of multifunctional infrastructure complexes among the total volume of new and renovated construction. Projects with a developed stylobate part are characterized by significant demand, as well as placing parking lots in the space of underground floors. Such solutions make it possible to effectively use the underground space while minimizing the filling of 1–5 floors. The latter requirement is typical for the construction of historic centers, where urban restrictions regulate the maximum height of the building. The research is aimed at increasing the efficiency of works provided they are combined during the arrangement of underground phase of multifunctional complexes, which are built in the historic part of cities, in a densely built-up area and extremely limited space. Methodology. The authors reviewed the world experience in the installation of multifunctional complexes and introduced best practices in organizational and technological solutions during the development of design and technological documentation for the arrangement of underground phase of the object «New construction of a multifunctional complex with parking at 25 Volodymyra Vernadskoho Street, Dnipro.» The main construction processes of the underground phase arrangement in difficult conditions of compacted construction are considered and the critical elements during their design are determined. The technological sequence of performing related works by various contractors has been improved in order to create a time reserve and increase the reliability of the entire technological process. Findings. Organizational and technological solutions have been identified that allow combining construction and installation processes of underground phase of multifunctional complexes with a significant number of subcontractors under conditions of compacted construction, as well as under complex hydrogeological conditions or during construction in the historic buildings of the central part of cities. Originality. The authors for the first time conducted research in the field of underground phase arrangement given the location of construction equipment in the limited space of the construction site in the historic part of Dnipro and proposed a number of solutions to increase the reliability of the main construction process. Practical value. Based on the results obtained, one can correct the location of construction equipment and determine the rational sequence of construction and installation works, as well as predict the further development of construction technology. These studies can be useful during the study of disciplines «Technology of Construction Production», «Technology of special works», for the organization of scientific and practical seminars, refresher courses and more.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
密实施工条件下提高地下阶段施工与安装工程组合效率
目的。21世纪城市化发展的特点是多功能基础设施综合体在新建和改造建筑总量中的份额不断增加。茎部发达的项目的特点是需求大,以及在地下空间放置停车场。这样的解决方案可以有效地利用地下空间,同时最大限度地减少1-5层的填充。后一种要求是典型的历史中心建筑,城市限制规定了建筑的最大高度。研究的目的是在城市历史地段,在密集的建筑区域和极其有限的空间中,在多功能综合体地下阶段的安排中,提高工程的效率。方法。作者回顾了世界上安装多功能综合体的经验,并在设计和技术文件的开发过程中介绍了组织和技术解决方案的最佳实践,以安排地下阶段的项目“在第聂伯罗Volodymyra Vernadskoho街25号新建一个多功能综合停车场。”»考虑了在密实施工的困难条件下地下相布置的主要施工过程,并确定了设计过程中的关键因素。改进了各承包商执行相关工作的工艺顺序,以创造时间储备,增加整个工艺过程的可靠性。发现。已经确定了组织和技术解决方案,允许在紧凑的施工条件下,以及在复杂的水文地质条件下或在城市中心的历史建筑施工期间,将多功能综合体地下阶段的施工和安装过程与大量分包商结合起来。创意。鉴于建筑设备在第聂伯罗历史悠久的建筑工地有限的空间内的位置,作者首次在地下阶段安排领域进行了研究,并提出了一些解决方案,以提高主要施工过程的可靠性。实用价值。根据所获得的结果,可以纠正施工设备的位置,确定施工安装工程的合理顺序,并预测施工技术的进一步发展。这些研究在“建筑生产技术”、“特殊工程技术”等学科的研究中非常有用,可以用于组织科学和实践研讨会、进修课程等。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Place of Transport in the Sales Policy of the Industrial Enterprise Innovative Tools for Improvement of Construction Organization Processes in the Conditions of Dense Urban Development Identification of the Program Text and Algorithm Correspondence Based on the Control Graph Constructive-Synthesizing Model Organizational and Functional Structure of the System of Information and Analytical Management of Construction Waste Streams Improving the Efficiency of Combination of Construction and Installation Works During the Underground Phase Under Conditions of Compacted Construction
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1