Series-compensated line protection challenges in the CREZ region

Genardo T. Corpuz, K. Koellner, Jordan Bell, S. Rajan, A. Somani, M. Thompson
{"title":"Series-compensated line protection challenges in the CREZ region","authors":"Genardo T. Corpuz, K. Koellner, Jordan Bell, S. Rajan, A. Somani, M. Thompson","doi":"10.1109/CPRE.2014.6799035","DOIUrl":null,"url":null,"abstract":"While series compensation of transmission lines is not new technology, it is becoming more prevalent due to significant changes in the way grids are being operated. Compensating lines makes better use of transmission line investments and available right of way. However, series capacitors create many challenges for protection engineers. These challenges are mitigated using modern protective relays, robust telecommunications channels, and advanced transient simulation tools to validate protection systems. The Lower Colorado River Authority (LCRA) in the United States is protecting a series-compensated line on their transmission grid for the first time as part of the Competitive Renewable Energy Zone (CREZ). This paper discusses experiences in designing, setting, and validating the new protection system.","PeriodicalId":285252,"journal":{"name":"2014 67th Annual Conference for Protective Relay Engineers","volume":"44 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-04-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 67th Annual Conference for Protective Relay Engineers","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CPRE.2014.6799035","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

Abstract

While series compensation of transmission lines is not new technology, it is becoming more prevalent due to significant changes in the way grids are being operated. Compensating lines makes better use of transmission line investments and available right of way. However, series capacitors create many challenges for protection engineers. These challenges are mitigated using modern protective relays, robust telecommunications channels, and advanced transient simulation tools to validate protection systems. The Lower Colorado River Authority (LCRA) in the United States is protecting a series-compensated line on their transmission grid for the first time as part of the Competitive Renewable Energy Zone (CREZ). This paper discusses experiences in designing, setting, and validating the new protection system.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
系列补偿线路保护在CREZ地区的挑战
虽然输电线路串联补偿不是一项新技术,但由于电网运行方式的重大变化,它正变得越来越普遍。补偿线路可以更好地利用输电线路的投资和可用的路权。然而,串联电容器给保护工程师带来了许多挑战。使用现代保护继电器、稳健的电信通道和先进的瞬态仿真工具来验证保护系统,可以减轻这些挑战。作为竞争性可再生能源区(CREZ)的一部分,美国科罗拉多河下游管理局(LCRA)首次在其输电网上保护了一条串联补偿线路。本文论述了新型保护系统的设计、设置和验证的经验。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Testing the tester, common pitfalls testing Microprocessor based relays Improvements in the operation of a distance relay during resistive faults Preventing transformer mis-operations for external faults Open-circuited CT misoperation and investigation Enhanced distribution feeder fault location
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1