{"title":"Dynamic Monitoring and Intelligent Network System Design and Implementation for Mandatory Inspection Measurement Instruments","authors":"Chang Hu, Y. Yang, Juanli Hu, L. Guo","doi":"10.1109/ICEE.2010.984","DOIUrl":null,"url":null,"abstract":"This article analyzes the existing process problem on archiving the measuring instruments which have gone through compulsory examination in China. The system archives data online intelligently, shares data with the Measurement and Technology Agency, updates automatically at pre-determined intervals, dynamic and real-time monitoring by the Quality Supervisory Bureau (at district or county level), controls and supervises via the Internet by the Government Measurement Administration Team and issues warnings at critical levels which were preset. With this 5-in-1 system, it dynamically manages all the processes and the data is then submitted and achieved once only. So duplicate effort and data redundancy could be avoided.","PeriodicalId":420284,"journal":{"name":"2010 International Conference on E-Business and E-Government","volume":"8 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-05-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 International Conference on E-Business and E-Government","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICEE.2010.984","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
This article analyzes the existing process problem on archiving the measuring instruments which have gone through compulsory examination in China. The system archives data online intelligently, shares data with the Measurement and Technology Agency, updates automatically at pre-determined intervals, dynamic and real-time monitoring by the Quality Supervisory Bureau (at district or county level), controls and supervises via the Internet by the Government Measurement Administration Team and issues warnings at critical levels which were preset. With this 5-in-1 system, it dynamically manages all the processes and the data is then submitted and achieved once only. So duplicate effort and data redundancy could be avoided.