e-Tendering readiness in construction: the posterior model

Moath Al Yahya, M. Skitmore, A. Bridge, M. Nepal, D. Cattell
{"title":"e-Tendering readiness in construction: the posterior model","authors":"Moath Al Yahya, M. Skitmore, A. Bridge, M. Nepal, D. Cattell","doi":"10.1108/CI-06-2017-0051","DOIUrl":null,"url":null,"abstract":"The purpose of this paper is to varied a conceptual model for e-Tendering readiness in any construction organisation prior of implementing e-Tendering system.,Based on conceptual model called e-Tendering readiness model (e-TRM), this paper empirically examines the e-TRM’s interactions and causal relationships between e-Tendering constructs and e-Tendering readiness. The paper uses the structural equation modelling technique to test the hypothesised positive inter-relationships. A questionnaire survey is conducted for respondents of construction organisations in Saudi Arabia to understand their current e-Tendering readiness and importance of e-Tendering variables.,Supported by empirical evidence, this paper recognised that three out of nine constructs have direct influences on the e-Tendering readiness. However, one of the constructs, which is for the first time hypothesised and tested has the most effect.,Ultimately, the empirical test for the e-TRM is conducted in certain case (Saudi Arabia); however, the e-TRM needs to be tested in other case area for more verification.,The study findings update previous information technology/information system models in construction by adding this tested model to the research literature on traditional and electronic tendering and the body of knowledge in the construction industry.,The service providers construct is proposed and tested for the first time, which is necessary to support the successful e-Tendering implementation.","PeriodicalId":221945,"journal":{"name":"Construction Innovation: Information, Process, Management","volume":"29 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-02-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"12","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Construction Innovation: Information, Process, Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/CI-06-2017-0051","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 12

Abstract

The purpose of this paper is to varied a conceptual model for e-Tendering readiness in any construction organisation prior of implementing e-Tendering system.,Based on conceptual model called e-Tendering readiness model (e-TRM), this paper empirically examines the e-TRM’s interactions and causal relationships between e-Tendering constructs and e-Tendering readiness. The paper uses the structural equation modelling technique to test the hypothesised positive inter-relationships. A questionnaire survey is conducted for respondents of construction organisations in Saudi Arabia to understand their current e-Tendering readiness and importance of e-Tendering variables.,Supported by empirical evidence, this paper recognised that three out of nine constructs have direct influences on the e-Tendering readiness. However, one of the constructs, which is for the first time hypothesised and tested has the most effect.,Ultimately, the empirical test for the e-TRM is conducted in certain case (Saudi Arabia); however, the e-TRM needs to be tested in other case area for more verification.,The study findings update previous information technology/information system models in construction by adding this tested model to the research literature on traditional and electronic tendering and the body of knowledge in the construction industry.,The service providers construct is proposed and tested for the first time, which is necessary to support the successful e-Tendering implementation.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
电子投标施工准备:后验模型
本文的目的是改变任何施工组织在实施电子投标系统之前的电子投标准备的概念模型。基于电子投标准备度模型(e-TRM)的概念模型,实证研究了电子投标结构与电子投标准备度之间的交互作用和因果关系。本文采用结构方程建模技术对假设的正相关关系进行检验。我们对沙特阿拉伯的建筑组织的受访者进行了问卷调查,以了解他们目前的电子投标准备情况和电子投标变量的重要性。在经验证据的支持下,本文认识到9个结构中有3个对电子投标准备有直接影响。然而,其中一个构念,这是第一次假设和测试有最大的影响。最后,在某些情况下(沙特阿拉伯)对e-TRM进行实证检验;然而,e-TRM需要在其他案例领域进行测试以进行更多的验证。研究结果更新了以前的建筑信息技术/信息系统模型,将这个经过测试的模型添加到传统和电子投标的研究文献中,以及建筑行业的知识体系。首次提出并测试了服务提供商结构,为电子招标的成功实施提供了必要的支持。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
The feasibility of transparent solar panels for high-rise building façade in Sri Lanka Detecting skewed pricing in tenders for public-sector projects Understanding the key risks in circular construction projects: from systematic review to conceptual framework A critical review of quantity surveying education in an offsite construction perspective: strategies for up-skilling Development and testing of lean simulation game on set-based design
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1