Preventive Maintenance Scheduling with Age Replacement Method at CNG Station

Cicilia Bangun, A. Jalil, Derajat Amperajaya, R. Rasjidin
{"title":"Preventive Maintenance Scheduling with Age Replacement Method at CNG Station","authors":"Cicilia Bangun, A. Jalil, Derajat Amperajaya, R. Rasjidin","doi":"10.34306/att.v4i2.260","DOIUrl":null,"url":null,"abstract":"CNG Mother Station focused to distribute Compressed Natural Gas for various industries. In the period from December 2020 to November 2021, there were 40 breakdowns in the distribution process machine causing delays in distribution of CNG. Company has to pay attention to the maintenance scheduling for vulnerabl components. This study aims to determine Preventive Maintenance scheduling and calculating maintenance costs using Age Replacement method for the critical components. The results showed that the critical components are Air Supply’s Hose (ASH) and Double Nipple Stage 4 (DNS-4). The proposed optimal replacement time interval for the ASH is 20 days where 19 component replacements are scheduled in 1 year with a cost reduction up to 4.8% compared to existing. The optimal replacement time interval for DNS-4 components is 24 days, which is scheduled for 16 component replacements in 1 year with cost reduction up to 29.1% compared to existing.","PeriodicalId":143921,"journal":{"name":"Aptisi Transactions on Technopreneurship (ATT)","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2022-07-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Aptisi Transactions on Technopreneurship (ATT)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.34306/att.v4i2.260","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

CNG Mother Station focused to distribute Compressed Natural Gas for various industries. In the period from December 2020 to November 2021, there were 40 breakdowns in the distribution process machine causing delays in distribution of CNG. Company has to pay attention to the maintenance scheduling for vulnerabl components. This study aims to determine Preventive Maintenance scheduling and calculating maintenance costs using Age Replacement method for the critical components. The results showed that the critical components are Air Supply’s Hose (ASH) and Double Nipple Stage 4 (DNS-4). The proposed optimal replacement time interval for the ASH is 20 days where 19 component replacements are scheduled in 1 year with a cost reduction up to 4.8% compared to existing. The optimal replacement time interval for DNS-4 components is 24 days, which is scheduled for 16 component replacements in 1 year with cost reduction up to 29.1% compared to existing.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
采用年龄置换法的CNG站预防性维修计划
CNG母站专注于为各行业销售压缩天然气。在2020年12月至2021年11月期间,配送过程机发生了40次故障,导致CNG配送延迟。公司必须重视易损件的维修计划。本研究旨在运用年龄置换法,确定预防性维修计划,并计算维修成本。结果表明,关键部件是送风软管(ASH)和双节4级(DNS-4)。建议的最佳更换时间间隔为20天,其中1年内计划更换19个组件,与现有组件相比,成本降低了4.8%。DNS-4组件的最佳更换时间间隔为24天,计划在1年内更换16个组件,与现有组件相比,成本降低高达29.1%。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
CiteScore
4.20
自引率
0.00%
发文量
0
期刊最新文献
The Influence of Leadership Dynamics and Workplace Stress on Employee Performance in the Entrepreneurial Sector and the Moderating Role of Organizational Support Moderating Effect Of Employee Service Quality And Mediating Impact Of Experiential Marketing in UAE Entrepreneurial Sector Impact of Self-Efficacy and Work Discipline on Employee Performance in Sociopreneur Initiatives Technopreneurship in Pro-Environmental Behavior for Sustainable Carbon Emission Reduction in Central Kalimantan Empathy Map Gen Z Towards Healthy Food: A Foodpreneur Design Strategy
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1