{"title":"DESCRIPTION OF NOISE IN THE COMPRESSOR AND GENERATOR AREA AT PT PERTAMINA EP ASSET 3 TAMBUN FIELD – BEKASI","authors":"Pipit Marfiana","doi":"10.33603/jgst.v7i1.14","DOIUrl":null,"url":null,"abstract":"PT Pertamina EP Asset 3 Tambun Field is a state-owned company engaged in Production Exploration, in the process this company has tools that must pay attention to the noise level, namely Compressors and Gensets. Compressors and generators are very influential on hearing loss in workers, therefore efforts to prevent hearing loss must be carried out. The objectives to be known are to know the noise conservation program, Standard Operating Procedures (SOP) in implementing noise conservation, and Implementation of Noise Conservation in Compressor and Genset Areas. This research method uses direct observation, interviews and literature studies. The results show that the Hearing Conservation Program has 7 (seven) components, namely: noise exposure survey, noise control, worker training, personal protective equipment, audiometric examination, recording and reporting, program assessment. The procedure used refers to the Individual Work Procedure (TKI) for Noise Measurement. The implementation of the Noise Measurement Program is carried out by the contractor once every 1 (one) year or every time there is a process change or a new tool. The Hearing Conservation Program must continue to make continuous improvements. It should be noted in monitoring workers in the Genset and Compressor area so that workers always use hearing protection equipment.\n ","PeriodicalId":419103,"journal":{"name":"Journal of Green Science and Technology","volume":"45 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-08-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Green Science and Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33603/jgst.v7i1.14","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

PT Pertamina EP Asset 3 Tambun Field is a state-owned company engaged in Production Exploration, in the process this company has tools that must pay attention to the noise level, namely Compressors and Gensets. Compressors and generators are very influential on hearing loss in workers, therefore efforts to prevent hearing loss must be carried out. The objectives to be known are to know the noise conservation program, Standard Operating Procedures (SOP) in implementing noise conservation, and Implementation of Noise Conservation in Compressor and Genset Areas. This research method uses direct observation, interviews and literature studies. The results show that the Hearing Conservation Program has 7 (seven) components, namely: noise exposure survey, noise control, worker training, personal protective equipment, audiometric examination, recording and reporting, program assessment. The procedure used refers to the Individual Work Procedure (TKI) for Noise Measurement. The implementation of the Noise Measurement Program is carried out by the contractor once every 1 (one) year or every time there is a process change or a new tool. The Hearing Conservation Program must continue to make continuous improvements. It should be noted in monitoring workers in the Genset and Compressor area so that workers always use hearing protection equipment.  
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
pertamina公司3号资产tambun油田- bekasi压缩机和发电机区域的噪声描述
PT Pertamina EP Asset 3 Tambun油田是一家从事生产勘探的国有公司,在这个过程中,该公司有必须注意噪音水平的工具,即压缩机和发电机组。压缩机和发电机对工人的听力损失影响很大,因此必须努力防止听力损失。要了解的目标是了解噪声保护计划,执行噪声保护的标准操作程序(SOP),以及压缩机和发电机组区域噪声保护的实施。本研究方法采用直接观察法、访谈法和文献研究法。结果表明,听力保护计划有7个组成部分,即:噪声暴露调查、噪声控制、工人培训、个人防护装备、听力检查、记录报告、计划评估。所采用的程序是指量度噪音的个别工作程序。噪音测量计划的实施由承包商每1年或每次有工艺变化或新工具时进行。听力保护计划必须继续不断改进。在对发电机组和压缩机区域的工作人员进行监控时应注意,使工作人员始终使用听力保护设备。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
COST AND TIME ANALYSIS OF DRAINAGE WORKS USING CONVENTIONAL RIVERSTONE METHOD AND PRECAST U-DITCH METHOD CORRELATION ROAD GEOMETRIC ON ROAD DAMAGE CAR PARKING NEEDS ANALYSIS AT CAMPUS A, JAKARTA STATE UNIVERSITY IN THE CONSTRUCTION PERIOD FACTORS CAUSING TIME DELAYS COMPLETION OF CONSTRUCTION PROJECTS(Case Study on Facilities Building Construction ProjectSports Stage 5 Construction of the East Stand) EFFECTIVENESS OF ABSORPTION WELLS USING THE SUNJOTO METHOD TO CONTROL FLOODING IN THE VILLAGE OF NGRASEH BOJONEGORO
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1