{"title":"Perancangan Efisiensi Lintasan Produksi dengan Menggunakan Metode Helgeson-Birnie (Ranked Positional Weight) Untuk Meningkatkan Kapasitas Produksi (Studi Kasus Pada Unit Produksi I Shift I PT. SUMBETRI MEGAH)","authors":"Wiky Sabardi, Ryan Pramanda, Dewiyana, Diki Suhanda","doi":"10.55377/jurutera.v8i02.5534","DOIUrl":null,"url":null,"abstract":"The problem of line balancing in industry, assembling, and manufacturing often occurs. This is indicated by a relatively high bottleneck of work in process at several stations, resulting in non-optimal line efficiency and non-smooth process flow. This study aims to calculate line balancing and determine the division of work stations that can increase production capacity in the production unit I shift I pt. Magnificent resource. This study used the Helgeson-Birnie (Ranked Positional Weight) method. From this research, the design results were obtained with line efficiency (line efficiency) 89.16%, idle time 2730.85, balance delay 10.84%, smoothness index (smoothness index) 781.24, and the number of work stations 15. Based on the calculation, it can be seen that there is an increase in line efficiency from 74.46% to 89.35%, which is 14.89%.","PeriodicalId":414829,"journal":{"name":"JURUTERA - Jurnal Umum Teknik Terapan","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-12-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"JURUTERA - Jurnal Umum Teknik Terapan","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.55377/jurutera.v8i02.5534","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
The problem of line balancing in industry, assembling, and manufacturing often occurs. This is indicated by a relatively high bottleneck of work in process at several stations, resulting in non-optimal line efficiency and non-smooth process flow. This study aims to calculate line balancing and determine the division of work stations that can increase production capacity in the production unit I shift I pt. Magnificent resource. This study used the Helgeson-Birnie (Ranked Positional Weight) method. From this research, the design results were obtained with line efficiency (line efficiency) 89.16%, idle time 2730.85, balance delay 10.84%, smoothness index (smoothness index) 781.24, and the number of work stations 15. Based on the calculation, it can be seen that there is an increase in line efficiency from 74.46% to 89.35%, which is 14.89%.