Identifying Factors Influencing Time and Cost Overruns in Public Construction Projects in Bhutan

Yeshey Lotay, Ugyen Wangdi
{"title":"Identifying Factors Influencing Time and Cost Overruns in Public Construction Projects in Bhutan","authors":"Yeshey Lotay, Ugyen Wangdi","doi":"10.58696/230009","DOIUrl":null,"url":null,"abstract":"Construction industries worldwide are impacted by time and cost overruns, resulting in significant financial loss and failure to complete projects on time. Clients, contractors, and consultants can plan properly for public construction projects if they have a better understanding of cost and time overruns. The Construction Development Board (now Bhutan Construction and Transport Authority) is the lead agency regulating and overseeing the government construction projects in Bhutan. However, in recent four years, from July 2017 to June 2021, about 50% of the total 2111 government construction projects experienced time and cost overruns, and the total financial loss was Nu. 2,578.86 million. Therefore, study was designed to examine the factors causing delays and cost escalations in the construction project implemented by government during the financial year July 2017 to June 2021. Thus, this study explores identifying factors influencing time and cost overruns to avoid time delays and financial losses. The primary data was collected through the questionnaire survey from engineers of 20 Dzongkhags and 4 Thromdes. The secondary data was collected from the CDB's annual reports, the Construction Association of Bhutan (CAB), and the National Statistics Bureau (NSB). The data was analyzed using the descriptive statistics method, and the relative importance index (RII) was calculated to rank the factors identified from literature reviews. The research results show that financial issue was the critical factor causing delays and cost escalation in the government construction project in Bhutan. Followed by the issue of delays and cost overruns due to shortage of local construction materials, inadequate experience of the contractor, poor site planning, shortage of skilled workers, unrealistic schedule, design change, contractual issues, and project manager competence.","PeriodicalId":251398,"journal":{"name":"Construction Journal of Bhutan","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-08-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Construction Journal of Bhutan","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.58696/230009","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Construction industries worldwide are impacted by time and cost overruns, resulting in significant financial loss and failure to complete projects on time. Clients, contractors, and consultants can plan properly for public construction projects if they have a better understanding of cost and time overruns. The Construction Development Board (now Bhutan Construction and Transport Authority) is the lead agency regulating and overseeing the government construction projects in Bhutan. However, in recent four years, from July 2017 to June 2021, about 50% of the total 2111 government construction projects experienced time and cost overruns, and the total financial loss was Nu. 2,578.86 million. Therefore, study was designed to examine the factors causing delays and cost escalations in the construction project implemented by government during the financial year July 2017 to June 2021. Thus, this study explores identifying factors influencing time and cost overruns to avoid time delays and financial losses. The primary data was collected through the questionnaire survey from engineers of 20 Dzongkhags and 4 Thromdes. The secondary data was collected from the CDB's annual reports, the Construction Association of Bhutan (CAB), and the National Statistics Bureau (NSB). The data was analyzed using the descriptive statistics method, and the relative importance index (RII) was calculated to rank the factors identified from literature reviews. The research results show that financial issue was the critical factor causing delays and cost escalation in the government construction project in Bhutan. Followed by the issue of delays and cost overruns due to shortage of local construction materials, inadequate experience of the contractor, poor site planning, shortage of skilled workers, unrealistic schedule, design change, contractual issues, and project manager competence.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
确定影响不丹公共建设项目时间和成本超支的因素
世界各地的建筑行业都受到时间和成本超支的影响,导致重大的经济损失和未能按时完成项目。如果客户、承包商和顾问对成本和时间超支有更好的了解,他们就能正确地规划公共建设项目。不丹建设发展局(现为不丹建设和运输管理局)是不丹管理和监督政府建设项目的领导机构。然而,从2017年7月到2021年6月,近四年来,在2111个政府建设项目中,约有50%的项目出现了时间和成本超支,总财务损失为25.7886亿元。因此,该研究旨在检查在2017年7月至2021年6月财政年度政府实施的建设项目中导致延误和成本上升的因素。因此,本研究探讨识别影响时间和成本超支的因素,以避免时间延误和财务损失。本研究的主要数据是通过问卷调查的方式收集到20个宗卡格和4个血栓的工程师。次要数据收集自国家开发银行的年度报告、不丹建筑协会(CAB)和国家统计局(NSB)。采用描述性统计方法对数据进行分析,计算相对重要指数(relative importance index, RII)对文献综述中发现的因素进行排序。研究结果表明,财政问题是导致不丹政府建设项目延误和成本上升的关键因素。其次是由于当地建筑材料短缺、承包商经验不足、现场规划不佳、技术工人短缺、不切实际的时间表、设计变更、合同问题和项目经理能力而导致的延误和成本超支问题。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Analysis of road accidents due to obstruction in sight distance caused by foggy weather using Geographic Information System (GIS) and Artificial Neural Network (ANN) at Jumja along Thimphu-Phuentsholing Highway (Asian Highway 48) Identifying Factors Influencing Time and Cost Overruns in Public Construction Projects in Bhutan Enhancing Financial Sustainability of Urban Water Supply Systems in Bhutan: A case study of Thimphu Thromde (Municipality).
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1