TEES BARRAGE BRIDGE DESIGN

N. Carstairs
{"title":"TEES BARRAGE BRIDGE DESIGN","authors":"N. Carstairs","doi":"10.1201/9781482271355-10","DOIUrl":null,"url":null,"abstract":"An account is given of the design of a tubular steel road bridge across the River Tees barrage at Blue House Point, Stockton. The result of an architectural competition, the design comprises arches with circular infill members resulting in as transparent an appearance as was possible. Details are given of decisions taken during the design in order to accommodate the highest loading specified by the Department of Transport whilst keeping the original architectural concept. Initial analysis of part of the steelwork showed that the bridge steelwork behaved in unusual ways. A space frame model of the whole bridge was developed and analysed on a Sun Sparc workstation using Oasys GSA analysis software. 279 loadcases were examined. The final design which contains 350 tonnes of tubular steel and 280 tonnes of plates and cast steel, has a conventional reinforced concrete deck.","PeriodicalId":198241,"journal":{"name":"Highways and transportation","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"1993-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Highways and transportation","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1201/9781482271355-10","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

An account is given of the design of a tubular steel road bridge across the River Tees barrage at Blue House Point, Stockton. The result of an architectural competition, the design comprises arches with circular infill members resulting in as transparent an appearance as was possible. Details are given of decisions taken during the design in order to accommodate the highest loading specified by the Department of Transport whilst keeping the original architectural concept. Initial analysis of part of the steelwork showed that the bridge steelwork behaved in unusual ways. A space frame model of the whole bridge was developed and analysed on a Sun Sparc workstation using Oasys GSA analysis software. 279 loadcases were examined. The final design which contains 350 tonnes of tubular steel and 280 tonnes of plates and cast steel, has a conventional reinforced concrete deck.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
三通拦河桥设计
介绍了斯托克顿蓝屋点横跨蒂斯河拦河坝的钢管公路桥的设计。建筑竞赛的结果是,该设计包括带有圆形填充构件的拱门,从而使外观尽可能透明。详细介绍了在设计过程中所做的决定,以适应交通部规定的最高负荷,同时保持原有的建筑概念。对部分钢结构的初步分析表明,该桥钢结构表现不正常。在Sun Sparc工作站上,利用Oasys GSA分析软件建立了整座桥梁的空间框架模型并进行了分析。共检查了279个负载箱。最终的设计包含350吨钢管和280吨钢板和铸钢,有一个传统的钢筋混凝土甲板。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
CONGESTION CHARGING FOR LONDON TEES BARRAGE BRIDGE DESIGN The use of reinforcement geotextiles to support road embankments over areas subjected to mining subsidence A review of two European design methods for geotextile reinforced unpaved roads MARGINS OF SAFETY IN POLYMERIC SOIL REINFORCEMENT
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1