PENERAPAN METODE SIMPLEKS DALAM OPTIMASI BIAYA PENGGUNAAN ALAT BERAT PADA PEKERJAAN CUT AND FILL PROYEK WORKSHOP PT. INKA PERSERO

Moh. Aji Pangestu, Yuni Ulfiyati, Zulis Erwanto
{"title":"PENERAPAN METODE SIMPLEKS DALAM OPTIMASI BIAYA PENGGUNAAN ALAT BERAT PADA PEKERJAAN CUT AND FILL PROYEK WORKSHOP PT. INKA PERSERO","authors":"Moh. Aji Pangestu, Yuni Ulfiyati, Zulis Erwanto","doi":"10.57203/jriteks.v1i1.2022.35-40","DOIUrl":null,"url":null,"abstract":"The Engineering, Procurement, Construction, Commissioning (EPCC) project of the train workshop in Banyuwangi has an area of 83 hectares, and 30 Ha. The project area has uneven elevation contours, so cut and fill work is necessary. Cut and fill works require the use of heavy equipment so that the implementation can be completed according to the schedule and can optimize costs without neglecting the time to be achieved. The purpose of this study was to apply the simplex method in optimizing the cost of using heavy equipment in cut and fill work at the PT INKA Persero. The results of the application of the simplex method in optimizing the cost of using heavy equipment in cut and fill work for excavation work in combination 4 with excavator type 2 with a total of 3 units, dump truck type 1 with a total of 6 units, and bulldozer type 1 with a total of 2 units, with a total cost of Rp.4.955.077.432. For the optimal alternative tools for embankment work, namely alternative combinations of 4 by using excavator type 2 totaling of 2 units, dump trucks type 1 totaling of 3 units, bulldozer type 1 totaling 1 unit, vibro roller totaling 1 unit, and water tank truck totaling 1 unit, with the total cost of Rp. 3,403,048.016.","PeriodicalId":107540,"journal":{"name":"Jurnal Riset Teknik Sipil dan Sains","volume":"10 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-08-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Riset Teknik Sipil dan Sains","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.57203/jriteks.v1i1.2022.35-40","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

The Engineering, Procurement, Construction, Commissioning (EPCC) project of the train workshop in Banyuwangi has an area of 83 hectares, and 30 Ha. The project area has uneven elevation contours, so cut and fill work is necessary. Cut and fill works require the use of heavy equipment so that the implementation can be completed according to the schedule and can optimize costs without neglecting the time to be achieved. The purpose of this study was to apply the simplex method in optimizing the cost of using heavy equipment in cut and fill work at the PT INKA Persero. The results of the application of the simplex method in optimizing the cost of using heavy equipment in cut and fill work for excavation work in combination 4 with excavator type 2 with a total of 3 units, dump truck type 1 with a total of 6 units, and bulldozer type 1 with a total of 2 units, with a total cost of Rp.4.955.077.432. For the optimal alternative tools for embankment work, namely alternative combinations of 4 by using excavator type 2 totaling of 2 units, dump trucks type 1 totaling of 3 units, bulldozer type 1 totaling 1 unit, vibro roller totaling 1 unit, and water tank truck totaling 1 unit, with the total cost of Rp. 3,403,048.016.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
采用更简单的方法,在PT. PERSERO裁减和填充项目工场中使用重型设备的成本优化
Banyuwangi列车车间的工程、采购、建设、调试(EPCC)项目占地83公顷,30公顷。项目区高程轮廓不均匀,需进行填切。切填工程需要使用重型设备,以便能够按照计划完成实施,并且可以在不忽略实现时间的情况下优化成本。本研究的目的是应用单纯形法来优化PT INKA Persero开采和充填作业中使用重型设备的成本。应用单纯形法对2型挖掘机共3台、1型自卸车共6台、1型推土机共2台组合开挖填土工程重型设备使用成本进行优化的结果,总成本Rp.4.955.077.432。堤防工程的最佳替代工具为:2型挖掘机共计2台、1型自卸车共计3台、1型推土机共计1台、振动压路机共计1台、水罐车共计1台4种替代组合,总成本为Rp. 3,403,048.016。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
PENGARUH PENAMBAHAN ABU SABUT KELAPA TERHADAP NILAI CBR TIDAK TERENDAM PADA TANAH LEMPUNG DI DESA PESUCEN KECAMATAN KALIPURO PERHITUNGAN KAPASITAS LIFT SEBAGAI SARANA TRANSPORTASI VERTIKAL PADA GEDUNG BERTINGKAT INSPEKSI KESELAMATAN JALAN DI RUAS JALAN GATOT SUBROTO, KOTA TEGAL, JAWA TENGAH FAKTOR-FAKTOR PENYEBAB KEGAGALAN KONTRAKTOR DALAM EVALUASI PENAWARAN DI KABUPATEN BANYUWANGI EVALUASI DAYA DUKUNG DAN PENURUNAN BORED PILE BERDASARKAN HASIL PENGUJIAN PDA (PEMBANGUNAN UNIVERSITAS KH. ABDUL WAHAB HASBULLAH JOMBANG)
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1