{"title":"Electricity market equilibrium, efficiency and operation risk: Some observations","authors":"F. Alvarado","doi":"10.1109/PES.2009.5275695","DOIUrl":null,"url":null,"abstract":"Electricity markets in many areas of the country continue to operate successfully. In many ways, operating the system according to market bids has proven to be not that different from old style operation under an optimum power dispatch regime; however, the compensation and incentives for market participants and producers are markedly different than previously. Several salient issues have become highlights of at least certain operational regimes under markets.","PeriodicalId":258632,"journal":{"name":"2009 IEEE Power & Energy Society General Meeting","volume":"9 7 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2009-07-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2009 IEEE Power & Energy Society General Meeting","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PES.2009.5275695","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Electricity markets in many areas of the country continue to operate successfully. In many ways, operating the system according to market bids has proven to be not that different from old style operation under an optimum power dispatch regime; however, the compensation and incentives for market participants and producers are markedly different than previously. Several salient issues have become highlights of at least certain operational regimes under markets.