Alarm and status processing and display in the Nuplex 80+ Advanced Control Complex

D. Harmon, T. M. Starr
{"title":"Alarm and status processing and display in the Nuplex 80+ Advanced Control Complex","authors":"D. Harmon, T. M. Starr","doi":"10.1109/HFPP.1992.283388","DOIUrl":null,"url":null,"abstract":"The development of a nuclear power advanced control room includes the improvement of previous generation alarm system designs. The Nuplex 80+ Advanced Control Complex alarm methodology utilizes redundant and diverse fixed-location and CRT alarms. These alarms are grouped by panels and presented on system and function display pages to support operator tasks. Plant operational mode-dependency, prioritization, signal-validation and equipment status dependency are used to improve alarm validity, and to reduce and organize alarms. Human engineered visual and audible cuing support prioritization and reduce distractions for new alarms. Critical function and success path alarms directly support operator procedures for power production and emergencies.<<ETX>>","PeriodicalId":150946,"journal":{"name":"Conference Record for 1992 Fifth Conference on Human Factors and Power Plants","volume":"37 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1992-06-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Conference Record for 1992 Fifth Conference on Human Factors and Power Plants","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/HFPP.1992.283388","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

Abstract

The development of a nuclear power advanced control room includes the improvement of previous generation alarm system designs. The Nuplex 80+ Advanced Control Complex alarm methodology utilizes redundant and diverse fixed-location and CRT alarms. These alarms are grouped by panels and presented on system and function display pages to support operator tasks. Plant operational mode-dependency, prioritization, signal-validation and equipment status dependency are used to improve alarm validity, and to reduce and organize alarms. Human engineered visual and audible cuing support prioritization and reduce distractions for new alarms. Critical function and success path alarms directly support operator procedures for power production and emergencies.<>
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
报警和状态处理和显示在Nuplex 80+高级控制综合体
核电先进控制室的开发包括对上一代报警系统设计的改进。Nuplex 80+高级控制复杂报警方法利用冗余和多样化的固定位置和CRT报警。这些警报按面板分组,并在系统和功能显示页面上显示,以支持操作员的任务。利用工厂运行模式依赖、优先级、信号验证和设备状态依赖来提高报警有效性,减少和组织报警。人类设计的视觉和听觉提示支持优先级,并减少对新警报的干扰。关键功能和成功路径警报直接支持电力生产和紧急情况的操作程序
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
When technicians use computer programs: approaches to procedure writing The evaluation of crew factors in aircrew team performance Performance of nuclear power plant or automated system depends on operator's availability Getting the attention of senior management for human factors issues: quantitative survey data Progress of I&C system and control room design in TEPCO nuclear power plants
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1